• 项目工程工期风险评估项目风险控制科学管理中的基础环节

    The risk assessment ACTS as a foundation link in the control and management of engineering project.

    youdao

  • 论文研究期望建筑工程项目工期风险管理提供一种有效方法

    The research is expected to present a valid risk-management method on the time limit for a construction project.

    youdao

  • 模糊网络计划,计算模糊工期风险概率利用模糊事件概率普通事件概率表示方法,用常规概率方法求解。

    Using the expression way of general event probability to fuzzy event probability, common method of probability can find fuzzy event period risk for fuzzy network planning.

    youdao

  • 本文通过对大型水电站建设进行全面分析建立水电站建设工期风险评价模型运用改进模糊综合评价方法进行风险评价。

    This thesis analysis the whole construction of the large hydropower station, and establish risk assessment models, and then use the improved fuzzy synthetic discrimination to determine the weight.

    youdao

  • 意在通过合理约定邀约条件设定使成为发包人规避工期延误风险事前控制举措

    This paper tries to conduct some prior control measures to help the employer to control the delay risk through reasonable calculation and setting of the tender condition.

    youdao

  • 高新工程研制过程普遍采用了并行工程方法,虽然大幅度地缩短工期但是风险较高

    Having been widely adopted in the management of research and development (R&D) projects, concurrent engineering can largely shorten the time limits for projects, however, its risk is higher.

    youdao

  • 洪水风险事件识别采用层次分析法进行,并结合施工工期防洪标准来确定洪水发生概率

    The method of Analytic Hierarchy Process is used to identify the risk events of flood. The probability of flood is determined by construction period and flood control standard.

    youdao

  • 建立一个工期费用估计随机网络模型,说明应用蒙特卡洛模拟进行工期和费用风险分析原理方法

    A stochastic network model is built by use of the theory and method of Monte Carlo Simulation, with a view to analyzing the risk of the time limit for project and its cost.

    youdao

  • 最后,应用本文建立的方法对北山连续刚构桥进行了施工期间地震及洪水风险分析和评价,表明本文所建立方法的可行性合理性。

    And then the decision making is done. A case study is carried for Beishan Bridge. It indicates that the established frame for risk analysis is feasibility and rationality.

    youdao

  • 本文首先结合有的风险分析理论和方法,建立了连续刚构桥地震洪水风险分析基本流程

    Combined with the exiting risk theory, the basic processes of risk analysis concerning earthquake and flood for long-span continuous rigid-frame Bridges during construction are established.

    youdao

  • 结构工期平均风险远远高于使用期,开展大跨度斜拉桥风险分析研究十分必要的。

    The average risk of structure in construction period is far higher than one in use period. To make the risk analysis study is very necessary in the construction of large-span cable-stayed bridge.

    youdao

  • 采用德尔菲风险等级评估提出了施工风险控制措施

    Risk grades is evaluated during the construction using the Delphi method and risk control measures are proposed.

    youdao

  • 本文针对新奥法隧道工期采用非线性模糊综合评判方法进行了风险评估

    The author carries out the study on nonlinear fuzzy judgment method for Risk assessment of the tunnel construction in NAT.

    youdao

  • 这些特点决定工期存在较多经济技术风险

    Therefore high risks would be induced in the deep excavation engineering such as economic and technological risks during construction.

    youdao

  • 这些特点决定工期存在较多经济技术风险

    Therefore high risks would be induced in the deep excavation engineering such as economic and technological risks during construction.

    youdao