• AC复合式路面沥青混凝土面层碾压混凝土板采用特殊技术有机地组合在一起的一种路面结构。

    RCC-AC composite pavement is a pavement structure using a special technique to combine the asphalt concrete surface with the rolled concrete plate used as a base in a proper way.

    youdao

  • 介绍了银汞合金核、螺纹复合树脂桩核、铸造金属桩核、组合式桩核制作方法临床应用

    There are such types of pile combs as silver-mercury, thread compound, mould metal, combination. The thesis also discusses the making and the clinical application.

    youdao

  • 根据零件特点设计了一组合冲孔落料复合冲压两种产品,介绍了模具结构论述组合纵梁复合模的结构特点。

    According to parts character, a pair of assembled punching, blanking compound die punching is designed, die structure is introduced, and assembled carling compound die structure is stated as well.

    youdao

  • 基于相对系数法经验公式法提出复合式事例修改策略,通过不同修改规则优化组合保证了事例修改正确性

    To improve the accuracy of case modification, a relative value and experience mixed modification strategy was put forward to combine and optimize the evaluation rules.

    youdao

  • 经纱取,纬纱式卷取,复合式取,组合卷取。

    Warp wind, weft wind, compound wind, combined wind.

    youdao

  • 结论组合外固定器复合有限固定,创伤小复位满意,固定可靠治疗长管状粉碎性骨折理想方法之一。

    Conclusion: the combined external and limited internal fixation method for the treatment of comminuted fracture of long bones is reliable and satisfactory.

    youdao

  • 本文提出传感器叠加组合,构成复合式传感器新的相对振动测量方法装置。

    This paper gives a new method ani equipments for measuring relative vibration, in which a complex transducer are built up by two or more transducers.

    youdao

  • 结果表明组合3d织物增强复合材料具有接近正交3d机织物增强复合材料弹性模量抗拉强度

    The results show that the Young's modulus and tensile strength of the combinational 3d woven fabric reinforced composite are close to that of the 3d orthogonal woven fabric reinforced composite.

    youdao

  • 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;

    youdao

  • 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定