本文介绍了秦山核电厂10年来的堆芯燃料管理改进情况。
This article introduces the in-core fuel management strategy improvement of Qinshan Nuclear Power Plant in its 10-year operation.
本文介绍了秦山核电厂10年来的堆芯燃料管理改进情况。
This article introduces the in-core fuel management strategy improvement of Qinshan Nuclear Power Plant in its 10-yea...
并可与相应的堆物理计算程序构成一个完整的堆芯燃料管理程序。
A integrated code for in core fuel management was formed by combining this code with a reactor physics code.
叙述了CNP1500核电站堆芯燃料管理设计方案及主要计算结果。
The in-core fuel management design scheme and main calculation results for CNP1500 nuclear power plant are presented.
组件均匀化参数的计算是核供热堆物理设计及堆芯燃料管理计算的基础。
The calculation of homogeneous parameters is the basis of physics calculation in nuclear heating reactors(NHRs).
核电站堆芯多循环换料设计最优化是燃料管理研究中的一个难点。
Multi-cycle refueling design optimization in nuclear plant is a complex problem in fuel management research.
FITLINK是NDFMPS堆芯核设计和燃料管理程序系统的主要程序之一,是一个组件截面参数处理程序。
FITLINK is one of main programs of NDFMPS that is core nuclear design and fuel management program system, and is a treatment program of cross section parameter of fuel assembly.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
应用推荐