等高沟克服了这个问题,因为这些沟垂直于主坡方向布置,沟道坡度约为0.5%。
Contour furrows overcome this problem because they are placed on a gradient of about 0.5 % across the main slope.
在石人沟铁矿的试验结果表明采用垂直深孔预裂爆破技术在该矿是一种可行方案。
The test results show that the technology of vertical deep hole presplitting blast is a feasible method in Shi Rengou Iron Mine.
通过对倾斜矿体下盘底部结构的设计,总结了堑沟与凿岩巷道在垂直与平行位置关系,经比较和验算后合理设计底部结构,减少了开采损失贫化。
The vertical and parallel relations of the trench with drill drift are summarized by the bottom structure disposal design on inclined orebody footwall.
本文对北方典型贝类大规模养殖海湾桑沟湾进行了其海水与沉积物之间氮、磷和有机质的垂直通量进行了初步的研究。
The natural sedimentation affected by biodeposit production and the flux between the seawater and sediments are also concerned in this paper.
本文对北方典型贝类大规模养殖海湾桑沟湾进行了其海水与沉积物之间氮、磷和有机质的垂直通量进行了初步的研究。
The natural sedimentation affected by biodeposit production and the flux between the seawater and sediments are also concerned in this paper.
应用推荐