待位移传感器和土压力计读数稳定后,采用自上而下摘板的措施模拟桩前土开挖的施工过程。
In order to simulate the excavation process of soil in front of piles, the boards are taken down from top to bottom after the readings of displacement sensors and soil pressure cells are stable.
待位移传感器和土压力计读数稳定后,采用自上而下摘板的措施模拟桩前土开挖的施工过程。
In order to simulate the excavation process of soil in front of piles, the boards are taken down from top to bottom after the readings of displacement sensors and soil pressure cells are stable.
应用推荐