周宁水电站地下厂房及引水系统的监测项目包括围岩变形监测、锚杆应力计监测、渗透压力监测、测缝计监测。
The monitoring project of Zhouning Hydropower station underground plant and water intake system including monitoring of the surrounding rock deformation, bolt stress, osmotic pressure and joint.
结果表明,硬度实验类似于压缩实验中的镦粗,硬度计压头可使金属基体发生塑性变形及粘性流动。
It demonstrated that the experiment of hardness is likely to upset in the experiment of compression. Hardness tester indenter make matrix metal plastic deformation and viscous flow happen.
大量程引伸计的弹性元件处于大变形工作状态,引伸计的非线性矛盾较突出。
The linearity of a large range extensometer is a critical problem, because its elastic'element is under large deformation.
介绍了用光干涉法测量微加速度计零件变形的研究。
A study on measurement of deformation micro-accelerometer parts with optical interferometry is presented.
对冷弯型钢的纵向变形过程进行了力学分析,得到了变形微分方程,求得了转动角的理论公式,并对其变形形状进行了分析计。
Through the mechanical analysis, the differential equation for the longitudinal deformation of cold forming steel is derived, and the formula for longitudinal rotation Angle is obtained.
介绍了在软弱岩体中静荷载测试中钻孔弹模计法的原理和方法,并将该法运用到现场,得到了软弱岩体的压力变形的两种特殊形式。
The principle of a new static loading test method for weak rock masses, a method of borehole elastic modulus gauge, is described.
此应用程序模拟太阳系,使用加速度计各方,并移动它改变形象和相应的行星名称。
This application emulates the solar system, using the accelerometer all sides moving it and changing the image and name of the corresponding planet.
这个程序可以计算静电力使结构发生的变形,可以计算加速度作用时微加速度计的输出电压。
The subroutine can be used to calculate the deformation of structures subjected to electric field, and the output voltage of micro-accelerometer subjected to acceleration.
用光镜、扫描电镜、透射电镜和硬度计等手段分析并研究其表层变形层金相组织、晶粒尺寸及显微硬度。
The surface layers are characterized by means of optical microscope, TEM, SEM and micro-hardness testing machine.
分析了计及高阶横向剪切变形的正交各向异性弹性板自由振动的问题。
The transverse shear deformation effect is included by use of Mindlin-Reissner first-order shear deformation theory.
所以,即使您的关键代码在保护后未经变形和保护,也需要耗费破解者很长的时间才能找到,而往往只是一行两行代码,穿插在数以万计的垃圾代码中,是极其隐蔽和猥琐的。
NoobyProtect uses the most advanced techniques to mutate and merge your original code, inserting tons of anti-debug and anti-trace codes as well as junk codes.
在现场踏勘的基础上,分析了地表GPS和地表裂缝计监测资料,初步研究了金川二矿区的地表变形规律和地表裂缝的产生原因。
Based on reconnaissance trip, the monitoring data of GPS and ground fissures in mining area No. 2 of Jinchuan Nickel mine are discussed.
在现场踏勘的基础上,分析了地表GPS和地表裂缝计监测资料,初步研究了金川二矿区的地表变形规律和地表裂缝的产生原因。
Based on reconnaissance trip, the monitoring data of GPS and ground fissures in mining area No. 2 of Jinchuan Nickel mine are discussed.
应用推荐