介绍了蒸汽发生器二次侧的降质、清洗与目视检查的管理、清洗方法与目视检查的推荐。
This paper describes degradation of steam generator secondary side, management of cleaning and visual inspection, recommendation of cleaning approach and visual inspection.
停堆初期(第一阶段)的冷却过程:通过蒸汽发生器将反应堆冷却剂系统的能量传输给二次侧的蒸汽。
The initial phase of reactor cooldown is accomplished by transferring heat from the reactor coolant system to the steam and power conversion system through the steam generator.
采用集中参数处理方法,把直流蒸汽发生器二次侧按流体相变分区,建立了动态热工水力模型。
The dynamic thermal hydraulic model of Once Through Steam Generator (OTSG) is developed, Which characterized by lumped parameters with moving boundary.
根据蒸汽发生器二次侧工质的流动特点,将迁移时间分成四段计算,并重点提出了管束区汽相运动的速度分布计算模型。
According to the flow characters of secondary side fluid, the transit times divide into four sectors from tube sheet to the sensor on steam line.
根据蒸汽发生器二次侧工质的流动特点,将迁移时间分成四段计算,并重点提出了管束区汽相运动的速度分布计算模型。
According to the flow characters of secondary side fluid, the transit times divide into four sectors from tube sheet to the sensor on steam line.