• 货船上的甲板起货机工作时消耗电功率很大,且时间发生不规则波动,决定船舶主电站配置有着直接影响。

    The deck cargo gear onboard cargo ship consumes a lot of power, which fluctuates irregularly as time goes on. It effects directly the selection of the ship's power plant.

    youdao

  • 优点在于这些更小电站可以位于电网之外,提供农村用户

    The advantage is that these smaller plants can be located off the main electric grid to supply rural customers.

    youdao

  • 结古镇街上幸存者涌进公用电话亭亲属朋友们拨打免费电话,有的则手机电站为自己的手机充电。

    Survivors packed temporary phone booths and charger stations on Gyegu`s main street, trying to make free calls to relatives and friends or recharge their cellphones.

    youdao

  • 结古镇街上幸存者涌进公用电话亭亲属朋友们拨打免费电话,有的则手机电站为自己的手机充电。

    Survivors packed temporary phone booths and charger stations on Gyegu's main street, trying to make free calls to relatives and friends or recharge their cellphones.

    youdao

  • 本文简要介绍了电站接入系统电气接线设计及其优化过程以及开关站位置选择

    The paper briefly introduces plant connecting into system, electric busbar connection design and their optimized process, as well as switch station site selection.

    youdao

  • 大型电站接线可靠性要求更为严格,接线应用往往受到断路器检修,即开环运行的影响。

    The large power station is strict to the electrical connection scheme, the application of angle scheme usually influenced by overhaul of line breaker which cause unloosed topology.

    youdao

  • 介绍一种用于电站自动化系统中的通用测控装置重点介绍了CPU模板PLC模块实现

    A universal measurement and control equipment for automatic system of the substation is introduced. The realization of the PLC module in the CPU master module is presented emphatically.

    youdao

  • 低压配电柜开始配线,低压配电柜位于低压电站

    Distribution will be done from the Main Low Voltage Distribution Panel (MLV), located in the LV Substation.

    youdao

  • 电站核岛一回路系统核心,对核反应堆的安全运行至关重要作用

    The main pump is the core of the first loop in a nuclear power plant, and it plays a vital role on the safety of the nuclear reactor operation.

    youdao

  • 就变电站监控模型部分,本文IEC61850标准建模的核心思想为基础,根据现有技术条件提出在RTAP实时运行环境上建立变电站监控站模型的方法

    Modeling methods of SCADA have been put forward based on RTAP runtime environment of current technology conditions after the author masters the IEC61850 standards' kernel ideas.

    youdao

  • 变非电量测控系统适应电力调度自动化电站实现无人值班综合自动化一种新型自动测控系统。

    Non-electrical quantity detecting system is a new auto-control system that adapt automation of electric scheduling, self-service and integrating automatism in substation.

    youdao

  • 电站反应堆一回路关键设备设备状态优劣直接影响电站安全和运行

    Reactor primary Pump is the important equipment in the primary circuit, its working quality would directly influence the safety and operation of nuclear power plant.

    youdao

  • 高坝洲电站经过改造电气接线大大提高电站经济效益、系统稳定性操作灵活性

    Through the reform of the main electrical connection, the economical effect, operating stability and flexibility of Gaobazhou hydropower station are notably improved.

    youdao

  • 电站用电系统停故障将变电所冷却器保护通讯自动化等设备产生严重影响

    The outage of substation auxiliary power system has severe impact on the main transformer coolers, protection, communication and automation systems of substation.

    youdao

  • 万家寨电站投运不久,先后发现变压器绝缘油色谱分析总烃超标,存在过热缺陷

    Soon after commissioning of Wanjiazhai Hydropower Station, it was found that the over hot problem existed in three transformers.

    youdao

  • 通过实测数据进行分析,证明此方法用于电站冷却剂故障诊断可行的。

    The measuring data are analyzed, and the results show that it is feasible for the fault diagnosis system of main coolant pump in the nuclear power station.

    youdao

  • 对核电站蒸汽隔离结构系统性能运行可检修性进行了分析和比较,为蒸汽隔离阀的选型提供了参考

    The structure, system, performance, operation, maintenanciability of two kinds of main steam isolation valve (MSIV) are analyzed and compared, which provides reference for the setat type of MSIV.

    youdao

  • 通过对实现调度遥控“五防”几种方案进行分析提出建立调度电站一体化复合“五体系的建议。

    Upon analysis of several realizing schemes, this paper suggests the establishment of complex electric misoperation prevention system integrating dispatching master station and substations.

    youdao

  • 系统系统、电站电压无功实时控制子系统(VQC)通信子系统构成。

    This system consists of main station system, voltage reactive real-time control subsystem (VQC) and communication subsystem.

    youdao

  • 系统系统、电站电压实时控制子系统VQC通信子系统构成。

    This system consists of main station system, voltage and reactive-power real-time control subsystem(VQC)and communication subsystem.

    youdao

  • 电气接线方案选定,对电站电气部分设计具有非常重要意义,是水电站电气部分设计重要环节

    Selecting the electric main wiring plan has very important sense to the electric part design of the hydropower station, and in the key link of the electric part design of the hydropower station.

    youdao

  • 压水型反应堆电站中的核心设备之一

    The nuclear reactor coolant pump (RCP) is one of the core equipments in PWR nuclear Power Plant.

    youdao

  • 论文研究的电气接线综合评价系统针对高压配电网中110KV电站高压电气接线的设计。

    This paper presents a synthetic assessment system for main electric connection, especially for high-voltage main electric connection of 110KV substation.

    youdao

  • 采用CFD数值模拟方法电站地下厂房拱顶一端送风均匀性进行研究。

    The symmetrical ventilation at one end of vault in the main underground workshop of Xiluodu Power Dam was studied by the method of CFD.

    youdao

  • GIS使用不仅满足电站运行可靠性灵活性运行维护方便等要求而且简化电站电气接线

    When GIS is used, it can satisfy not only requirements of operation reliability, flexibility and convenience for operation maintenance, but also simplify main electrical connection of the station.

    youdao

  • 本文所介绍控制管理系统控制对象小型电站,该电站四台水轮发电机组变压器组成,全站采用分布式控制。

    The article introduces the control and management system of a small water power station. Th is station uses distributed control with four groups of generator and one group of main transformer.

    youdao

  • 系统自动化系统技术引入电站构建了电站自动化系统。

    In this system the technology of automatic master station is used for the substation and on this basis a substation automation system is constructed.

    youdao

  • 概述了天湖水电站厂房布置厂房在施工、运行交叉应用工况结构设计情况。

    This paper introduces briefly the layout of the power house and the main structure design condition of the main power house under the circumstances of construction, operation and cross application.

    youdao

  • 综述电站锅炉辅机及其零部件制造安装运行过程采用的各种无损检测技术的特点目的。

    The characters of some routine and new inspection methods in the manufacture, installation and period inspection process for the power station boiler are briefly introduced.

    youdao

  • 江苏沙河抽水蓄能电站上水库、副混凝土面板堆石坝。

    In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定