在首部甲板上安装首楼甲板。锚机,系泊配件和锚链管、艏桅杆处等的甲板结构需要加强。
Forecastle deck shall be provided on forward deck. Deck structures in way of windlass, mooring fittings, hawser pipes, foremast etc. shall be reinforced.
结合国内首栋预制装配整体式混凝土结构试验楼工程,对装配整体式叠合连续楼板进行现场加载试验研究。
Being related to the first assembled monolithic precast concrete testing-building in our country, the loading experimental study is introduced on assembled monolithic composite continuous slab.
结合国内首栋预制装配整体式混凝土结构试验楼工程,对装配整体式叠合连续楼板进行现场加载试验研究。
Being related to the first assembled monolithic precast concrete testing-building in our country, the loading experimental study is introduced on assembled monolithic composite continuous slab.
应用推荐