该方法应用在济南钢铁公司球团厂实际造球系统中,得到了理想的寻优结果。
The method has been applied to actual pelleting system in pellet Plant of Jinan Iron and Steel Co and perfect optimizing result has been obtained.
济南钢铁集团总公司第一炼铁厂热风炉风温较低,成为制约高炉技术经济指标提高的瓶颈。
The blast temperature is low in the first iron mill of jinan Iron and Steel Group Co… It becomes bottleneck of conditioning technique and economic target to elevate the blast furnace.
介绍了济南钢铁集团总公司第三炼钢厂转炉区域汽化冷却系统的组成、控制结构及操作模式。
This paper introduced the composition, the control structure and operation mode of the converter's boiler and cooling system in the 3rd Steelmaking Plant of Jinan Iorn and Steel Group Corporation.
介绍了济南钢铁集团总公司第三炼钢厂转炉区域汽化冷却系统的组成、控制结构及操作模式。
This paper introduced the composition, the control structure and operation mode of the converter's boiler and cooling system in the 3rd Steelmaking Plant of Jinan Iorn and Steel Group Corporation.
应用推荐