采用正交曲线网格生成技术建立一种明渠导流双戗堤立堵进占截流的数学模型。
The technique of orthogonal curve-linear grid generation is used to establish the mathematical model for the open diversion channel with two embankments in river blocking.
2002年,每天仍有数百艘船行经大坝的导流明渠。
In 2002, hundreds of ships still passed through the dam's diversion channel on a daily basis.
在三峡工程设计中提出一种新的设计思想,即在大坝施工过程中,导流明渠同时兼作施工通航。
A new idea in planning the Three Gorges dam is that the diversion channel is simultaneously considered as both stream flow diversion and navigation pass during dam construction process.
本文介绍了RTD实时动态gps测量系统在三峡导流明渠截流及三期土石围堰工程中的应用情况。
The application of GPS RTD system is introduced in the diversion channel closure and the third-stage soil rock cofferdam building engineering in Three Gorges projection.
黄河大峡水电站导流明渠施工期间,在进口处采用预留岩坎挡水。
During the construction of diversion channel in Daxia Hydropower Station in Yellow River, a retaining rock bar was reserved at entrance of diversion channel.
承建的导流明渠和纵向围堰工程。
Open Channel and Longitudinal Cofferdam Project Attributed to CGGC.
二期工程围左岸主河床 ,右岸明渠 (建于一期 )导流 ,建主河床泄洪坝段及左岸电站厂房。
The second stage is to close the left bank main river bed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.
二期工程围左岸主河床 ,右岸明渠 (建于一期 )导流 ,建主河床泄洪坝段及左岸电站厂房。
The second stage is to close the left bank main river bed, divert the stream to the right bank open channel and build the spillway section in the mian river bed and the powerhouse on the left bank.