一九九八年内,防止山泥倾泻计划共动用7.74亿元,以期增加每年完成斜坡巩固工程的数量。
During 1998, a total of $ 774 million was spent on the LPM Programme to increase the annual output of slope upgrading works.
一九九八年内,防止山泥倾泻计划共动用7.74亿元,以期增加每年完成斜坡巩固工程的数量。
During 1998, a total of $ 774 million was spent on the LPM Programme to increase the annual output of slope upgrading works.
应用推荐