If the basic construction cost is controlled very good, the goal of the total project cost will be achieved.
只要控制好最小施工单元的成本,项目总成本的目标就可以实现。
Because construction period is long for such large-sized project, investment cost occupies large proportion in total project costs.
电站工程规模大,工期较长,资金成本在全部工程造价中所占比例较大。
While test engineers cannot estimate total project cost, they can certainly estimate testing contribution to cost, and suggest test risks and feasibility.
虽然测试工程师不能估算总的项目成本,但是他们的确可以评估对成本的测试贡献,并且提出测试风险和可行性。
Certificate to prove that: the company can afford a starting point total project cost, which means the company can bear the highest number of projects.
资质证书证明的是:该企业所能承担的工程总造价起点,也就是说这个企业最高能承担那一些工程。
Construction cost constitutes only a fraction, though a substantial fraction, of the total project cost. However, it is the part of the cost under the control of the construction project manager.
建造成本是整个项目成本中的一部分,虽然很重要,但只是施工项目经理控制下的成本的一部分。
The project which began in 2007 is supposed to cost a total of 8,000,000,000 dollars.
该项目始于2007年,预计总造价为80亿美元。
There is no estimate yet of the total cost of the project or the volume of water involved.
目前还没有预测海水淡化项目的总费用或具体需用多少立方的海水。
If a company already has administrators who could be used for a new project (as opposed to having to add a new resource), it can impact the total cost of ownership.
如果公司让原有的管理员管理新项目(不添加新资源),则可能会影响总拥有成本。
His latest project is a mobile home the size of two tatami MATS, made up of DIY assembly parts and with a total cost of 26, 000 yen.
他的最新项目是两个榻榻米大小的流动之家,由DIY组装件组成,总成本为26000日元。
(On a project of this magnitude, if you're not willing to look at both the total benefit of ownership (TBO) and total cost of ownership (TCO) for the warehouse, you might as well stop now!)
(在此量级的项目中,如果您不愿意着眼于数据仓库总体拥有利益(total benefitofownership,TBO)和总体拥有成本(total cost of ownership,TCO),那么您倒不如现在就停止!)
We focus on simple yet critical goals: improving your return on assets, operational performance, total cost of ownership, project time-to-benefit, and shareholder value.
我们专注于简单但重要的目标:提高你的资本回报,运营成绩,物权总成本,项目开始至盈利时间,以及股东利益。
Suppose that we wish to estimate the total cost to complete piping construction activities on a project.
假定欲估算某项目直线管道铺设工程的总成本。
ARC focuses on simple yet critical goals: improving clients' return on assets, operational performance, total cost of ownership, project time-to-benefit, and shareholder value.
ARC专注于帮助客户实现简单但却具有关键意义的企业目标,包括提高客户资产收益率、运营绩效、降低总体拥有成本、缩短项目见效周期、提升股东收益。
In the remote automatic control irrigation system, the cost of data communication, generally accounts for 50% of the total input of the project.
在灌溉远程自动控制系统中,数据通讯部分的工程投入,一般占工程总投入的50%以上。
Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.
给出项目任务的成本和时间数据,六西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
It can economize the storey height; reduce the total cost of the project. So it is a type of floor with good application function and economy benefit.
应用于一般民用建筑和工业建筑,可以节约楼层净高,降低工程综合造价,具有良好的使用功能和经济效益。
Since the 80's, TQM and, quantification method fusion and quality cost, Total Quality Control, reliability project and zero flaw, have formed the more systematic TQM system.
80年代以来,全面质量管理与量化质量成本、全面质量控制、可靠性工程和零缺陷等方法融合,形成了较为系统的全面质量管理体系。
Control of materials costs is the crux for control the total cost of a highway project.
材料费用的控制是控制工程成本的关键。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
Then the manager will confront such a problem: how many workers he will hire or fire each month in order to keep the lowest total cost of the project.
因此,这个经理面临这样一个问题:他每个月将雇用或解雇多少员工才能使工程部的总开销最低。
Of the materials for each project, grades, prices and wages are clear, the total cost can be effectively controlled.
对每个项目的用料、档次、价格及工资都清清楚楚,花费总额才能有效的控制。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
应用推荐