• If the basic construction cost is controlled very good, the goal of the total project cost will be achieved.

    只要控制最小施工单元成本项目成本的目标可以实现。

    youdao

  • Because construction period is long for such large-sized project, investment cost occupies large proportion in total project costs.

    电站工程规模,工期较资金成本全部工程造价中所占比例较大

    youdao

  • While test engineers cannot estimate total project cost, they can certainly estimate testing contribution to cost, and suggest test risks and feasibility.

    虽然测试工程师不能估算总的项目成本但是他们的确可以评估成本的测试贡献并且提出测试风险可行性

    youdao

  • Certificate to prove that: the company can afford a starting point total project cost, which means the company can bear the highest number of projects.

    资质证书证明是:企业承担工程造价起点,也就是说这个企业最高承担一些工程

    youdao

  • Construction cost constitutes only a fraction, though a substantial fraction, of the total project cost. However, it is the part of the cost under the control of the construction project manager.

    建造成本整个项目成本中的一部分虽然重要,只是施工项目经理控制成本一部分

    youdao

  • The project which began in 2007 is supposed to cost a total of 8,000,000,000 dollars.

    项目始于2007年,预计造价80亿美元

    youdao

  • There is no estimate yet of the total cost of the project or the volume of water involved.

    目前没有预测海水淡化项目费用具体需用多少立方的海水。

    youdao

  • If a company already has administrators who could be used for a new project (as opposed to having to add a new resource), it can impact the total cost of ownership.

    如果公司原有管理员管理项目(不添加资源),可能影响拥有成本

    youdao

  • His latest project is a mobile home the size of two tatami MATS, made up of DIY assembly parts and with a total cost of 26, 000 yen.

    最新项目两个榻榻米大小流动DIY组装件组成成本为26000日元

    youdao

  • (On a project of this magnitude, if you're not willing to look at both the total benefit of ownership (TBO) and total cost of ownership (TCO) for the warehouse, you might as well stop now!)

    (量级项目如果愿意着眼于数据仓库总体拥有利益(total benefitofownership,TBO)总体拥有成本(total cost of ownership,TCO),那么您倒不如现在就停止!)

    youdao

  • We focus on simple yet critical goals: improving your return on assets, operational performance, total cost of ownership, project time-to-benefit, and shareholder value.

    我们专注简单重要目标提高资本回报运营成绩,物权成本项目开始至盈利时间,以及股东利益。

    youdao

  • Suppose that we wish to estimate the total cost to complete piping construction activities on a project.

    假定估算某项目直线管道铺设工程成本

    youdao

  • ARC focuses on simple yet critical goals: improving clients' return on assets, operational performance, total cost of ownership, project time-to-benefit, and shareholder value.

    ARC专注于帮助客户实现简单但却具有关键意义企业目标,包括提高客户资产收益率运营绩效、降低总体拥有成本、缩短项目见效周期、提升股东收益。

    youdao

  • In the remote automatic control irrigation system, the cost of data communication, generally accounts for 50% of the total input of the project.

    灌溉远程自动控制系统中,数据通讯部分工程投入一般工程投入的50%以上。

    youdao

  • Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.

    给出项目任务成本时间数据六西格玛计算出正常紧急加快生产费用以及最小的生产费用

    youdao

  • It can economize the storey height; reduce the total cost of the project. So it is a type of floor with good application function and economy benefit.

    应用于一般民用建筑工业建筑,可以节约楼层净高降低工程综合造价,具有良好使用功能经济效益

    youdao

  • Since the 80's, TQM and, quantification method fusion and quality cost, Total Quality Control, reliability project and zero flaw, have formed the more systematic TQM system.

    80年代以来全面质量管理量化质量成本、全面质量控制可靠性工程缺陷方法融合形成较为系统的全面质量管理体系。

    youdao

  • Control of materials costs is the crux for control the total cost of a highway project.

    材料费用控制控制工程成本关键

    youdao

  • Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.

    首先要素成本集成管理工程项目管理主要要素”——成本、进度质量一个整体奠定了项目全要素集成化管理的基础

    youdao

  • Then the manager will confront such a problem: how many workers he will hire or fire each month in order to keep the lowest total cost of the project.

    因此这个经理面临这样一个问题每个雇用解雇多少员工才能使工程部开销最低

    youdao

  • Of the materials for each project, grades, prices and wages are clear, the total cost can be effectively controlled.

    每个项目用料档次价格工资清清楚楚花费总额才能有效的控制。

    youdao

  • Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.

    利用直接费用间接费用费用关系,预测出总费用最低时对应的工期,从而给出工期一费用的优决策。

    youdao

  • Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.

    利用直接费用间接费用费用关系,预测出总费用最低时对应的工期,从而给出工期一费用的优决策。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定