You are now ready to run a test to show the effect of the changes you made.
现在,您已经做好了准备,可以运行测试来查看所做更改的效果了。
An example of this is when you run a test list that contains other test lists.
例如,当运行的测试列表中包含其他测试列表时便会出现这种情况。
The team then failed to run a test to establish that the cement seal was adequate.
而且,油井队没有进行实验来证明水泥封堵是合适得。
Or you can use actions that you record when you run a test to create a test case.
这可使查找测试用例更加轻松,还可以运行测试套件中的所有测试。
While you run a test using Test Runner, you have the option to add comments to the test steps.
在使用测试运行程序运行测试时,可以选择向测试步骤添加注释。
So you head to a doctor, who may run a test or two. But no clear cause for the symptom shows up.
于是你去看医生,医生也许会给你做一两项检查,但却找不出导致这些症状的原因。
View your product's order form and run a test order to ensure the configuration behaves how you expect.
查看产品订购单并进行订单测试,以保证配置正常运行。
It's unusual to run a test case or a charter (that isn't automated) where you can say that it passed 100%.
运行一个测试用例或许可证(不是自动的)而说其100%通过是不寻常的。
Run a test client application to load some data into the ObjectGrid, using a range of keys so that data is placed in all your partitions.
运行测试客户端应用程序,将一些数据加载到ObjectGrid中,使用一系列键以便将数据放到您的所有分区中。
There's no point in spending time and money to run a test suite, even one that passes all its tests, if it doesn't really exercise the project.
如果它不能真正运行这个项目,就没有必要花费时间和资金来运行这个测试套件,即使能够通过它所有的测试。
The goal of this step is to run a test of the application and evaluate its ability to generate and emit the events that WebSphere Business Monitor requires.
此步骤的目标是运行该应用程序的测试,并评估其生成和发射WebSphereBusinessMonitor需要的事件的能力。
To run a test case, it is sufficient to construct the test data based on the primary persona and then do additional accessibility checks based on the secondary personas.
要运行测试用例,构建基于主要角色的测试数据,然后根据次要角色检查附加的易访问性就足够了。
You might have noticed that the integration test client will prompt you to select a server location when you run a test; you can also use that dialog box to bring up the New Server wizard.
您可能注意到,当运行测试时,集成测试客户端将提示您选择服务器位置;您还可以使用该对话框打开新服务器向导。
Whether you are using an existing integration test client, or you have opened a saved one, to re-run a test, right-click an Invoke event and choose either Rerun or Rerun with auto-emulate.
无论您使用现有的集成测试客户端,还是打开保存的集成测试客户端,要重新运行测试,请右键单击调用事件,并选择Rerun或Rerun with auto - emulate。
Correctly sizing the heap requires that you enable verbosegc (verbose garbage collection statistics), run a test, and then analyze the verbosegc output to determine how to adjust the heap size.
正确调整对大小需要启用verbosegc (verbosegarbagecollectionstatistics,详细垃圾回收数据统计),运行测试,然后分析verbosegc输出结果来确定如何调整堆大小。
If you're worried about taking classes one after another in different buildings, a quick test run won't hurt.
若你担心在不同教学楼里一节接一节地上课,快速测试一下也无妨。
If possible, run your A/B test over at least one cycle to get more accurate numbers.
如果可能,请在至少一个周期内运行酸/碱比率测试以获得更准确的数字。
To run the test for a different browser, simply supply the name of the browser as the second argument.
要运行针对一个不同浏览器的测试,只需将浏览器的名称作为第二个参数提供。
If you depend on it, it's wise to run a small test during installation or initialization to make sure it works correctly.
如果您依赖它,那么在安装或初始化期间运行小测试来确保它能正确工作,这样做将是明智的。
Next, build your application on your current platform, but use the new build tools and run a full test cycle.
接下来,在当前的平台上构建应用程序,但要使用新的构建工具并运行一个完整的测试周期。
Instead, a developer needs a J2EE container to run and test them.
相反,开发者必须要有J2EE容器来运行和测试它们。
While this metric is of some value, in assessing the success of a stress test run, this metric reveals only a partial story of the larger test run.
当这个工具是某个值时,度量压力测试运行的成功情况,该工具揭示了大量测试之中只有小部分事例会运行。
Now, we check the SLA database at the end of a test run to determine the number of transactions conducted.
现在,我们在测试运行的末尾检查SLA数据库,以确定所进行的事务的数量。
In Step 2, the adapter receives the request and initiates a test run on the test machine.
在步骤2中,匹配器会接受在测试机器上运行的请求和测试。
Be sure to test your run time migration plans in a test environment before starting the migration of your production run time.
在开始迁移您的生产运行时之前,应该确保您的运行时迁移计划已经在实验环境中进行了测试。
Before you can run the EAB components, you must import them into projects that run on a test server configured to support the required connection managed factory.
在您能够运行EAB组件之前,您必须将它们导入到在测试服务器上运行的工程中,而测试服务器配置为支持所需的连接受管工厂。
As with manual test scripts, to run an automated script, you must associate it with a test case and a test execution (test run) record.
至于手动设置的测试脚本,为了运行一个自动化的脚本,您必须将其与一个测试用例和测试执行(测试运行)记录联系起来。
If there is a test run or a test cycle that would identify a specific test to be completed in shorter durations or more frequent test phases, consider using test suites to track the effort.
如果有一个测试运行或者一个测试周期对一个指定测试的辨别要在一个更短的持续时间内或者更加频繁的被完成,那么请您考虑使用测试套件来跟踪这一努力。
Test your run time migration plans in a test environment before starting the migration of your production run time. Migration is more than just installing new products.
在开始移植您的生产运行时以前,先在测试环境下测试您的运行时移植计划。
In other words, it's more effective to run a user test than to trust the judgment of an expert - even if she or he comes from outside the project team.
换句话说,真实的用户测试比所谓专家(即使他是来自外部的)的判断效率更高。
应用推荐