• Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.

    运用网络计划蒙特卡洛仿真(MCS),宏观项目微观的工序层分别进行进度风险分析

    youdao

  • If issues arise that might jeopardize the schedule, project management can proactively take steps to mitigate risk at every level.

    如果产生可能能够危害进度问题项目管理者可以预先进行各个级别采取减小风险措施

    youdao

  • A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.

    针对自己所有项目召开过次很关键会议关于问题风险项目进程明细表回顾会议。

    youdao

  • Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.

    便于整个项目生命周期中,项目范围进度风险绩效成本等问题项目干系人沟通

    youdao

  • The risk register includes information such as the risk owner, cause, effect, status, probability, impact of the risk on the project cost, schedule and customer.

    风险登记簿包含信息有风险责任人成因效应状态概率、风险项目费用进度客户影响

    youdao

  • The review activity in the process of product development will play a great role to ensure the project schedule, product quality and reduce the risk of development.

    型号研制中的评审活动对于保证工程进度质量以及降低研制风险至关重要作用

    youdao

  • The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.

    论文进度预警模型应用于DS水闸枢纽工程给出了进度警情,从而风险应对提供了理论依据。

    youdao

  • Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.

    因此,在研发项目实施之前开展进度风险分析十分必要

    youdao

  • To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.

    为了降低进度安排不当导致项目实施失败风险将时间约束网络应用项目实施进度计划研究

    youdao

  • The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.

    结果显示模型能够帮助项目经理制定风险管理计划合理的进度计划。

    youdao

  • Requirements volatility (RV) is a common information system project risk that can have severe consequences including cost and schedule overruns and at times, even cancelled projects.

    需求波动信息系统建设比较常见的风险,很可能造成进度延期、成本超支甚至项目取消

    youdao

  • The results show that the project management objective system with quality, schedule, cost, safety, environmental protection and risk can manage projects scientifically and comprehensively.

    结果表明:由质量进度成本安全环保风险六大管理目标构成的目标体系科学全面管理工程项目的重要保证。

    youdao

  • This thesis on 165mn press installation project quality, schedule, risk control, thus pointing out the general process of installing a large press, and the installation of process control.

    论文通过165MN安装项目质量进度风险控制论述,揭示大型压机安装一般性过程以及安装过程中的项目控制方法。

    youdao

  • Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.

    建立了研发项目多执行模式随机资源约束项目调度问题模型

    youdao

  • Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.

    建立了研发项目多执行模式随机资源约束项目调度问题模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定