• Overall project completion is scheduled for 2010.

    整体工程预计2010年完成。

    youdao

  • Project completion date: Aug. 2008 Project Location: East Plaza, Size: 2500sqm.

    工程竣工时间:2008年8月工程地址东方广场面积:2500平米

    youdao

  • Slack is the amount of time a task can be delayed without delaying the project completion date.

    浮动时间指没有延误项目完成的任务能够完成的时间。

    youdao

  • This means that task 3 can be delayed by 2 days without affecting the overall project completion date.

    意味着任务3可以延迟的情况下页不影响整个项目完成时间。

    youdao

  • The SPI, Which is used to forecast project completion date , is calculated by using which formula?

    进度执行情况指数用于预报项目完工日期,是以哪个公式计算的?

    youdao

  • At the project completion we would have cheaper electricity and reduce our pollution for future generation.

    项目完成时我们获得更便宜电能并且减少未来发电过程中所带来的污染

    youdao

  • Monitoring data show that all pollutant indexes have reached design standard after project completion.

    竣工监测数据表明各项污染物指标达到设计要求。

    youdao

  • Upon project completion it is important to review the entire project to determine what could be done better next time.

    项目完成的基础上,检查整个项目确定下一次哪些应该得更好十分重要的。

    youdao

  • Following technical materials should, by contractor on the date of project completion acceptance, be provided to employer.

    施工单位应当工程竣工验收合格建设单位提供下列技术资料

    youdao

  • The course from design to project completion is just like eclosion. The hardships of eclosion accomplish the beauty of butterfly.

    一个建设项目设计竣工过程如同一次破茧化蝶过程,破茧艰辛成就化蝶美丽

    youdao

  • Keep effective contact with Engineering Group document controllers, receive and manage as-built documentation upon project completion.

    技术服务、运营及项目有关的文控人员保持有效联系对完工的项目进行竣工文件接收管理

    youdao

  • Uncertainty factors of a project construct process which includes randomicity and fuzziness affect the evaluation of project completion time greatly.

    项目建设过程中的确定性因素对预测项目完工时间有较大影响,项目中的不确定性主要是随机性模糊性

    youdao

  • The application of the method can help improve the accuracy of project scheduling management, ensure project completion within the acceptable deviation.

    方法运用能够提高项目进度管理精度保证项目在可接受的进度偏差范围完成

    youdao

  • Meanwhile, to give full play to supervision works, strengthen field coordinating and managing will ensure to gain maximum profit after project completion.

    同时充分发挥监理作用加强现场协调管理,是工程建成获得最大经济效益保障

    youdao

  • Abstract: Construction engineering Technic material is the completion of the project completion and acceptance of the important basis of quality grade evaluation.

    摘要建筑工程施工技术资料工程完成后竣工验收评定质量等级时重要依据

    youdao

  • Abstract: Construction engineering Technic material is the completion of the project completion and acceptance of the important basis of quality grade evaluation.

    摘要建筑工程施工技术资料工程完成后竣工验收评定质量等级时重要依据