RUP USES a master test plan for the overall project and an iteration test plan per iteration.
RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
The master test plan and a detailed planning of test effort should be all that is produced prior to test execution.
主测试计划和测试工作的详细计划,应当是在测试执行之前所产生的所有文档。
In any case, the master test plan needs to ensure that the st and at are complementary with regard to test coverage.
无论如何,主测试计划需要确保,系统测试和验收测试是有关测试覆盖的补充。
These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).
这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。
The required organization is part of the template for the master test plan and the iteration test plan, but the corresponding activity is unclear.
需要的组织是主测试计划和迭代测试计划模版的一部分,但是相应的活动不清楚。
The development and enforcement of the guidelines is the Shared responsibility of the process engineers and should be consistent with the master test plan.
指南的开发和执行是过程工程师们的共有责任,并且应当是与主测试计划是一致的。
One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test.
一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。
This Define Evaluation Mission "workflow determines the test goal or test assignment for the iteration and the scope of the test based on the master test plan."
定义评价任务工作流确定了迭代的测试目标或测试任务,以及基于主测试计划的测试范围。
The paper introduces the master plan, principle, composition, characteristic parameter, operational test of it.
介绍了该设备总体方案、工作原理、设备组成、技术参数、试验运行情况。
The paper introduces the master plan, principle, composition, characteristic parameter, operational test of it.
介绍了该设备总体方案、工作原理、设备组成、技术参数、试验运行情况。
应用推荐