Estimating and planning development resources, schedules, and skill levels based on application quality requirements.
估算及策划开发资源、工作进度,以及基于应用软件质量要求的技术水平。
People end up with lots of questions like: How are you going to handle planning and estimating?
人们最终会有许多这样的问题:你们怎样计划和评估?
For technical leaders, project planning, estimating, and tracking are required in addition to having strong technical and technical leadership skills.
对于技术负责人,除了具备很强的技术和技术领导技能外,还必须进行项目计划、评估和跟踪。
The planning and estimating helps the team decide how much work will fit into the sprint.
规划和估计可以帮助团队决定满足Sprint的需求需要多大的工作量。
Most software engineering texts spend some amount of copy on project planning and estimating, including tools like the Constructive Cost Model (COCOMO).
大多数软件工程学课本都花费篇幅介绍项目计划和估计,包括类似ConstructiveCostModel (COCOMO) 5这样的工具。
Planning and estimating is basically a mechanism for first determining that the project is worth doing and later as an approach for keeping the project on track.
计划以及预估基本上是这样一种机制,首先,决定项目值得去做,然后作为一种方案,保持项目始终处于轨道中。
Iterative development is sometimes said to operate on such short time scales that there is no need for planning and estimating.
迭代化的开发有时被认为在很短的时间上执行,以至于不需要进行计划制定或预估。
In agile teams this is generally reflected in the use of planning poker and a focus on estimating by feature rather than task.
在敏捷团队中,这通常反映在规划扑克的使用和关注在功能估算而不是任务估算上。
Scale Master II makes it easy to do Linear, Area and Volume take-offs with speed, accuracy and confidence when estimating, bidding or planning.
规模硕士二更容易做线性,面积和体积起飞的速度,准确性和信心时估计,投标或规划。
Project cost Management includes the processes involved in planning, estimating, budgeting, and controlling costs so that the project can be completed within the approved budget.
项目成本管理包括与成本计划、成本估算、成本预算、成本控制相关的过程,用以确保项目能在核准预算内完成。
Courses include site planning, construction surveying, building systems drafting, technical writing, estimating, and related subjects.
课程有平面设计、施工测量、建筑系统拟草、专业写作、估计能力和相关学科。
Conclusion the lung injury range of paraquat poisoning patients seen on the initial CT images can provide the reference evidence for estimating the prognosis and planning the therapeutic protocol.
结论百草枯中毒首诊时肺部的损害范围对于判断预后和提供治疗方案具有显著指导意义。
Conclusion the lung injury range of paraquat poisoning patients seen on the initial CT images can provide the reference evidence for estimating the prognosis and planning the therapeutic protocol.
结论百草枯中毒首诊时肺部的损害范围对于判断预后和提供治疗方案具有显著指导意义。
应用推荐