• The study evaluates the results of cost reduction and increase in returns with Agile projects versus plan-drive approaches. It provided the following results.

    研究对比了敏捷项目计划驱动这两种不同途径,并对成本降低收益提高结果进行了评估

    youdao

  • By adding the index on the ACCT_ID_INX column, the new access plan shows a significant cost reduction from 3420.41 to 38.6219 timerons.

    通过ACCT _ ID _ IN x添加索引新的访问计划显示了3420.4138.6219timeron的较大成本缩减。

    youdao

  • This paper point out the problems existing in the calculation of project cost reduction and its negative effects, and draw out a method and plan in how to calculate and adjust the reduction.

    本文着重论述了目前计算工程成本降低额存在问题现实影响根据实践经验,总结正确调整计算工程成本降低额的步骤具体方法

    youdao

  • This paper point out the problems existing in the calculation of project cost reduction and its negative effects, and draw out a method and plan in how to calculate and adjust the reduction.

    本文着重论述了目前计算工程成本降低额存在问题现实影响根据实践经验,总结正确调整计算工程成本降低额的步骤具体方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定