• This attack is similar to the ping flood attack but with a clever modification to the process.

    这种攻击类似ping洪水攻击,它能巧妙地修改进程。

    youdao

  • Once the attack begins, websites can try to trace the sudden flood of traffic back to the source computer and filter it out, but even that's a complex process.

    一旦攻击开始网站可以尝试追踪突发洪水般的流量找到计算机对此加以过滤一个复杂的过程。

    youdao

  • The process of urbanization has a significant impact on the hydrological characteristics of a city, which causes the special and complex nature of the calculation method of urban flood.

    城市化进程城市水文特性产生了重大影响造成城市洪水计算特殊性复杂性

    youdao

  • Mainly around Lueyang Han Jialing River flood water introduces water conservancy project construction of embankment construction procedures, as well as a key step in the construction process.

    主要围绕略阳县嘉陵江西汉水干流防洪工程建设介绍了水利工程的堤防施工程序以及施工过程中的关键工序

    youdao

  • Triggered by outburst flood, mudflow is a kind of debris flow and also a form of soil erosion, and it is an indicator of the most serious soil erosion process in the Loess Plateau.

    黄土黄土地区一类重要灾害地貌过程,是泥石流一个特殊类型,是水土流失种特殊形式也是山地环境恶化、水土流失严重标志

    youdao

  • For increasing the modern logistics information technical application, a flood of thesis about the settle scheme, the process and the problem in logistics give abroad and thorough research.

    为了提高信息技术物流中的应用水平,大量学者就物流信息系统的解决方案、实施的步骤以及实施存在的问题进行了广泛深入的研究。

    youdao

  • The inside of the Yellow River flood control project management-the status quo analysis of the management process and the causes of the problems that exist, and Solutions to make a few suggestions.

    该文阐述黄河河道防洪工程建设项目管理目前状况分析了管理过程存在新问题及其产生的原因,提出几点解决策略建议。

    youdao

  • Based on a lot of observed river data, analyses were conducted on the evolution process and the flood discharging capacity of the shashi to Haoxue stretch of upper Jingjiang River.

    大量实测河道资料基础分析了荆江临江河段演变基本规律、发展趋势河道过能力

    youdao

  • Designed flood of reservoir is a typical flooding process under given engineering safety standard. The frequency of designed flood is regarded as hydrological risk.

    水库设计洪水就是给定工程安全标准情况下某个典型洪水过程,设计洪水频率特征表现的就是其水文风险。

    youdao

  • Adaptive filtering in time series analysis is used to predict a stream flood. The key in this process is determination of the adaptive constants and the number of weighted factors.

    尝试时间序列分析中的适应滤波法江河灾害性洪水进行预测认为加权因子个数自适应常数确定关键

    youdao

  • Actually, I agree with your comments on penetration point, we may need to enhance the engagement and consultation process for a good communication between stakeholders in the Flood risk Appraisal.

    实际上同意对于突破点的评述,我们可能需要洪水风险评价加强利益相关者的合作与磋商

    youdao

  • The overall process of constructing a hydropower project is the sub-period of controlling and leading flood.

    水电水利工程建设过程就是分时段对水流 进行控制疏导的 过程。

    youdao

  • The overall process of constructing a hydropower project is the sub-period of controlling and leading flood.

    水电水利工程建设过程就是分时段对水流 进行控制疏导的 过程。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定