以上项目乘积作为总分,供排序用。排序周期一般为每季度一次或半年一次。
The above project product as total score, for sorting by. Ranking cycle is generally once a quarter or half a year.
[摘要]投标商务文件占评标总分的50%以上,决定投标项目实施的经营风险。
Abstract: Business documents accounted for more than 50% of the bid evaluation score, decides the whole process of project implementation management risk.
观察组的SCL-90总分、总均分、阳性项目数和阳性症状均分都明显高于对照组,同时阴性项目数明显低于后者(P<0.05或P<0.01)。
The total score of SCL-90, average total score, number of positive items were all markedly higher in the observational group than those in the control group(P<0.05 or P<0.01).
结果病例组SCL-90总分、阳性项目、阳性总分和阳性均分均高于对照组。
Results The total score of SCL-90, number and total of positive item were significantly higher in patients group than those in control group.
用全距等分法给各项目记分,按总分数值大小排序,确定品种营养成分含量高低。
The varieties were arranged according to the scores given by Whole-distance-equal division method.
在周三的女团决赛中,中国队以总分188.9领先美国队两分多。美国队曾是世界冠军,在该项目上有两名最优秀的选手。
China finished with 188.9 points in the women's team final Wednesday, more than two points ahead of the Americans, who came in as world champions and with the sport's two best gymnasts.
本文对参考文献①中出现的数据计算错误作了纠正,并更正了我国女子七项全能总分影响的项目关联序列。
Some calculation errors and the improper seven-events relevant sequence in women's heptathlon put forward in a paper published before were corrected.
本文对参考文献①中出现的数据计算错误作了纠正,并更正了我国女子七项全能总分影响的项目关联序列。
Some calculation errors and the improper seven-events relevant sequence in women's heptathlon put forward in a paper published before were corrected.
应用推荐