• 采用控制容积钢—混凝土结合试件升温过程温度分布进行数值计算。

    The temperature distribution in temperature rising process of steel-concrete composite beam is calculated by volume-control method.

    youdao

  • 混凝土结合中,温度作用通常包括三种形式,即:温差温度梯度。

    Temperature changes, temperature diversities and temperature grades are common forms of temperature actions in steel and concrete composite girders.

    youdao

  • 本文总结前人工作基础,对结合斜拉桥中在弯矩共同作用下的钢—混凝土组合截面受力状态和混凝土桥面板有效宽度进行研究。

    This paper deals with the mechanical behaviors of steel-concrete composite beam and effective width of concrete slab on the axial force and the bending moment together function, based on the past job.

    youdao

  • 钢筋混凝土形成增强砌体结合

    The reinforced concrete forms a bond beam which strengthens the masonry.

    youdao

  • 预应力混凝土连续钢混结合公路铁路工程中的应用越来越普及。

    Prestressed concrete continuous box girder and steel-concrete composite girder are more and more adopted in construction of highway and railway.

    youdao

  • 预应力锚索钢筋混凝土结合使用较好地传递锚索强大作用力提供较大的

    The combination of prestressed anchorage cable and reinforced concrete beam and slab can well transmit the powerful action force of the cable, which can provide strong blocking and protecting force.

    youdao

  • 预弯组合简支钢板混凝土结合一种新型结构本文介绍组合基本构思设计施工等内容。

    Prebent combined simple supported beam, combining steel plate with concrete, is a new type beam structure. This paper introduces the basic conception, design and construction of this combined beam.

    youdao

  • 采用三维实体单元单元结合空间组合有限元方法座两曲线预应力混凝土连续进行空间受力分析

    Using a spatial composite finite element method, combining three-dimensional solid element and bar element, the mechanical analysis of a two-span curved PC continuous box girder bridge is conducted.

    youdao

  • 运用系统可靠度评估的方法,结合模型化为混凝土剪力传递器串联而成的结构系统。

    The composite beam structure is modeled as a series system consisted of concrete slab, shear studs and steel beam.

    youdao

  • 江津观音岩长江大桥为结合梁桥,防止桥面板湿接缝约束条件下产生裂缝,该桥面板湿接缝要求采用微膨胀混凝土补偿混凝土收缩变。

    In order to prevent the cracks that would be likely caused by restricted conditions of the wet-joint, the wet-joint demands using expansive concrete to compensate the shrinkage and creep.

    youdao

  • 结合试验结果粘钢加固混凝土不同卸载条件下受力机理进行解析分析,推导相应计算公式,加固设计提供

    Based on experimental results, the stress of the rc beams under different unloading condition is analyzed, the formulation is deduced and it provides a reference for the reinforcement design.

    youdao

  • 分析汴京虹桥基础上,将叠拱桥扩充钢筋混凝土结构钢管结构,并结合实例进一步对单孔叠拱桥构造、设计、计算和施工作了研。

    The reinforced concrete structure and steel tubular structure are included into the laminated beam arch bridges on the basis of analysis of Bianjing Rainbow Bridge.

    youdao

  • 损伤力学理论有限元法相结合研究钢筋混凝土简支载作用下损伤破坏过程

    Failure process for the reinforced concrete free beam under static loading is formulated based on the elastic damage theory with the finite element method.

    youdao

  • 为了使上层公路桥面板能帮助上弦杆抵抗巨大的纵向压力,正桥全部采用混凝土面板与共同作用的板桁结合梁

    In order to let the slabs help the top chords of the steel trusses resist the giant compressive forces, slab truss composite structures are used throughout the main bridge.

    youdao

  • 结合纤维增强钢丝混凝土建造,进行钢纤维增强钢丝网混凝土t的正截面强度裂缝计算

    To counter a bridge constructed with steel fiber reinforced ferroconcrete, the calculation of bending strength and crack of steel fiber reinforced ferroconcrete t beam has been accomplished.

    youdao

  • 本文预应力混凝土连续研究对象,采用有限元分析手段结合依托工程进行研究。

    In this paper, prestressed concrete continuous girder bridge is studied by using finite element analysis tool with support project.

    youdao

  • 结合4碱矿渣胶凝材料粘贴碳纤维布加固钢筋混凝土简支火灾火灾试验开展如下研究工作:(1)完成了该批试验升温1。

    Based on the experiment of 4 concrete simple beams reinforced by pasting CFRP sheet with AASCM subjected to fire and after fire, the following researches are carried out: 1.

    youdao

  • 方钢管混凝土组合结合构成种新型、高效住宅钢结构体系

    A new kind of composite structure system composing of CFT columns and composite slim-floor beams was put forward, which has much efficiency.

    youdao

  • 最后应用地震CT方法通过箱型桥墩结合混凝土进行了质量检测,从而上述工程中的混凝土质量做出了有效的评估

    At last, to detect quality of concrete which is in plate of bridge, bridge pier and well by method of seismic ct. Then evaluate concrete quality of above project effectually.

    youdao

  • 结合实际分析预应力混凝土截面连续挠曲性能。

    The flexural behavior of the prestressed concrete continuous box girder with variable cross-sections is analyzed through a practical example.

    youdao

  • 在建的武汉二七长江大桥采用结构,桥面板混凝土结构,主桥面板剪力件连接世界上最大跨度结合梁斜拉桥

    Erqi Yangtze River bridge is composite girder cable-stayed bridge with three towers with the longest span in the world, which is connected with steel girder and concrete slab.

    youdao

  • 鄂东长江大桥混合斜拉桥,PC-混凝土结合采用C55高性能混凝土

    On the prestressed concrete(PC) wide Box girder and the steel and concrete joint section of the bridge, the C55 high performance concrete is used.

    youdao

  • 试验条件下,修复新旧混凝土结合性能良好,修复后承载力有所提高

    Ih this test, the bond between new and old concrete in the repaids beams are good. The strength of repaids beams is higher than that of original beams.

    youdao

  • 试验条件下,修复新旧混凝土结合性能良好,修复后承载力有所提高

    Ih this test, the bond between new and old concrete in the repaids beams are good. The strength of repaids beams is higher than that of original beams.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定