The main bridge of Fumin bridge in Shenyang is a prestressed concrete cable-stayed bridge with double kinked column pylons and single cable plane.
沈阳市富民桥主桥为折线形双塔独柱式单索面预应力混凝土斜拉桥。
It is believed that the crossing will form the world's longest single-tower, asymmetric cable-stayed bridge.
据说,它将成为世界上最长的单塔不对称斜拉桥。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。
Taking the single pylon single cable plane pre-stressed concrete cable-stayed bridge as example, the paper discusses the principle, methods, testing items, and experiment conditions, etc.
文章以一座单塔单索面竖琴式预应力混凝土桥为例,详述了静动载试验的原理、方法、过程、测试项目、试验工况等。
The Changxing harbor bridge in Zhejiang is a prestressed cable-stayed bridge with two tower and single-cable-plane.
浙江长兴港大桥是一座双塔单索面预应力混凝土矮塔斜拉桥。
The scenic overlooks bridge in safari park in Hefei is a reinforced concrete single-pagoda cable stayed bridge.
合肥市野生动物园观景桥为钢筋混凝土倾斜独塔斜拉桥。
Abstract: Shanghai MinPu two bridge for single tower and double cable plane steel truss cable-stayed bridge of the composite beams.
摘要:上海闵浦二桥为独塔双索面钢板桁组合梁斜拉桥。
Analysis could also show, to improve the stress distribution of the twin-box single cross section of cable-stayed bridge, it is the best way by thickening the bottom flange.
分析还表明,加厚底板对斜拉桥双箱单室箱形主梁应力分布的改善效果最佳。
Analysis shows that it is the best way to improve the stress distribution of the twin-box single cross section of cable-stayed bridge by thickening the bottom flange.
分析表明:加厚底板对斜拉桥双箱单室箱形主梁应力分布的改善效果最佳。
There are few RC single-tower cable-stayed bridges with connected tower and separated decks in internal and international bridge engineering.
混凝土独塔斜拉桥采用联塔分幅的结构型式在国内外均属少见。
This paper presents the design principles, structural features and key construction technology of the new type of form traveler guyed by single cable plane for Xichang Cable-Stayed Bridge in Tonghua.
介绍通化西昌斜拉桥单索面牵索挂篮设计原理、构造特点、关键工艺。
It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.
这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。
The disadvantages of twin-box single cross hammerhead sections of cable-stayed bridge were also indicated. By the result, the optimum measures were proposed.
归纳出斜拉桥中此类双箱单室倒梯形截面的应力分布特点及薄弱环节,并提出优化措施。
The disadvantages of twin-box single cross hammerhead sections of cable-stayed bridge were also indicated. By the result, the optimum measures were proposed.
归纳出斜拉桥中此类双箱单室倒梯形截面的应力分布特点及薄弱环节,并提出优化措施。
应用推荐