Constraints - the traditional scope, schedule, and cost.
约束——传统的范围、日程和成本。
Alternatively, if the requirements, design constraints, and scope of the requirements have not yet been defined at this point, the workshop must take on a different course.
另外,如果此时还没有定义需求、设计限制以及需求的范围,则研讨会必须采用一个不同的过程。
Before the workshop, you should create an initial set of requirements (both functional and non-functional), design constraints, and specify the scope of those requirements.
在研讨会之前,您应该创建一组最初的需求(实用需求和非实用需求),设计限制,并指定这些需求的范围。
For example, annotations can specify the attributes of a service's scope, the nature of implementation, plus interaction attributes, constraints, and requirements.
例如,注释可以指定服务范围的属性、实现的本质以及迭代特性、约束和需求。
Since every project needs a source for capturing all stakeholders' expectations, the project scope, and requirements and constraints, I recommend documenting this information within a Vision document.
由于每个项目都需要一个获取所有涉众期望,项目规模,以及需求和限制的来源,我建议将这个信息存档到愿景文件中。
The stakeholders' expectations, project scope, requirements, and constraints are documented.
涉众的期望,项目的范围,需求以及约束都被存档。
If you're not sure where to start your research, start by taking a look at the goals, scope, and constraints of the project.
如果您不确定从哪里开始研究,请首先从项目的目标、范围和约束着手。
The profile does not impose constraints on that which is out of the scope of the profile.
概要对该概要的范围之外的内容不予约束。
Stakeholder concurrence on scope, requirements, constraints, and schedule estimates.
涉众在规模、需求,限制以及进度评估上的合作。
Constraints defined on the properties of the relation show the conditions used to narrow the scope of the candidate values.
定义在关联的属性上的限制表明了限制候选值的作用域的条件。
Hence, it is necessary that the profile provide constraints and guidance in the form of requirements as to the interoperable usage of the underlying specifications in the scope of the profile.
因此,概要有必要以概要范围内基础规范可互操作使用要求的形式提供约束和准则。
The constraints listed in the detailed project scope statement are typically more numerous and more detailed than the constraints listed in the project charter.
详细的项目范围说明书列出的制约因素,一般都比项目章程列出的多而详细。
Lists and describes the specific project constraints associated with the project scope that limit the team's options.
项目制约因素列出并说明同项目范围有关并限制项目团队选择的具体项目制约因素。
The scope of work lists the objectives, priorities, constraints, funding authorities, and reporting requirements for the DART.
任务清单列明目标、优先权、限制、出资机构及快速救援报告机制。
The potential conflicts between the stated objectives are about scope, cost, time and quality, and the constraints imposed on human material and financial resources.
在范围、成本、时间和质量的规定目标与人力资源和财力资源之间有潜在的冲突。
Typical constraints are scope, time and budget.
典型的约定条件如范围,时间和预算。
Typical constraints are scope, time and budget.
典型的约定条件如范围,时间和预算。
应用推荐