Real Estate Development Project; Risk; Fuzzy comprehensive assessment; System Dynamics.
房地产开发项目;风险;模糊综合评价;系统动力学。
Fuzzy; Analytic hierarchy; Risk assessment; Weight.
模糊;层次分析;风险评价;权重。
This paper discusses the risk assessment approaches by integration of fuzzy in LNG storage station system.
探讨了用模糊积分法对LNG储存站系统进行风险评价的方法。
The index of environment risk assessment system was established based on the properties of chemical engineering project. Fuzzy identification method as well as the case study was studied.
根据化工建设项目的特点,建立环境风险评价系统的指标体系,研究模糊评判方法,并应用实例进行分析计算。
And set up the AHP-FUZZY comprehensive safe system of risk assessment of oil depot on this basis finally.
失效后果因素六部分加以讨论,最后在此基础上建立了油库层次-模糊(AHP - FUZZY)综合安全风险评价体系。
A commercial bank credit risk assessment model based on fuzzy neural network is established using the credit assessment index system established for commercial Banks.
在确立了商业银行信用风险评价指标体系的基础上,建立了基于模糊神经网络的商业银行信用风险评估模型。
Based on the credibility theory, an algorithm for random fuzzy operational risk assessment is proposed, and power system operating risk is expressed by a random fuzzy expected value.
提出了基于可信性理论的运行风险评估算法,采用随机模糊变量的期望值表示全系统的运行风险指标。
The paper proposes a new risk assessment method for submarine rescue based on the fuzzy -logic system.
提出一种基于模糊逻辑系统的援潜救生风险评估方法。
In the part of risk answer, I spend plentyful energy in find the answer to the risk , found assessment index, construct a fuzzy evalution mode based on AHP and fuzzy maths.
建立了评价指标体系,构造了一个基于层次分析法与模糊数学基础上的风险应对方案模糊评价模型。
Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.
接着在对比分析各类风险评价方法的基础上,构建了基于模糊综合评价的风险决策模型;
To combine the hidden danger indices and the risk indices, a scientific and practical dynamic method of safety assessment of ship manoeuvring is established using fuzzy.
然后把隐患指标和风险指标结合起来考虑,运用模糊综合评价方法,设计出一种科学、实用的动态综合评价狭水道内船舶操纵安全的方法。
The application process that index risk assessment and the fuzzy comprehensive assessment method are applied to safe management of city gas pipeline is given.
详细阐述了指数评价法和模糊综合评审在城市燃气管网风险评价中的应用过程。
Because of fuzziness of risk assessment results, this paper achieved a more reliable evaluation result using fuzzy mathematical principles.
由于风险评价结果具有模糊性,采用模糊数学原理会取得较可靠的评价结果。
At present, the domestic risk assessment methods include expert points, fuzzy comprehensive evaluation and AHP.
目前,国内所运用的风险评价方法主要有专家打分法、模糊综合评判法和层次分析法。
Based on the theories of risk assessment and fuzzy comprehensive assessment, a new model of quantitative assessment to compute the risk degree of navigating ship on heavy sea was put forward.
根据风险分析理论,结合模糊综合评定数学模型,提出了一种对大风浪中航行船舶的危险度进行定量估算的模型。
Secondly, the use of fuzzy comprehensive evaluation is to evaluate the risks and benefits and calculate the value of risk assessment and evaluation of effectiveness.
其次,采用模糊综合评估法分别对风险和效益进行评估,计算出风险评估值和效益评估值。
Simultaneously we utilized the fuzzy comprehensive evaluation to give a risk assessment mathematical model to the whole mobile payment system.
同时运用模糊综合评判法给出了整个移动支付系统的风险评估的数学模型。
In the end, we made a fuzzy comprehensive risk assessment for chemical enterprises (plastic plants and coal gas plants).
并对某化工企业(塑料厂和煤制气厂)进行模糊综合风险评估。
Based on the method of risk assessment, the fuzzy analysis is introduced to establish the classification of surrounding rock stability.
在风险评价方法的基础上,结合模糊理论,提出了围岩稳定性的风险评价分级方法。
It puts forward the risk assessment index system and sets up the risk comprehensive assessment model by using the theory of fuzzy mathematics.
提出了建设项目工程变更风险分析的评价指标体系,运用模糊数学原理建立了建设项目工程变更风险的综合评价模型。
The author carries out the study on nonlinear fuzzy judgment method for Risk assessment of the tunnel construction in NAT.
本文针对新奥法隧道施工期采用非线性模糊综合评判方法进行了风险评估。
Secondly, to conduct a systematic assessment on the risks of the three stages with the integrated AHP and fuzzy evaluation method to obtained their respective degrees of risk status.
其次,综合运用“层次分析法”和“模糊综合评价法”对川东北矿区油气钻井的钻前风险、钻进风险和完井风险进行系统评价,得出钻前、钻进和完井阶段的风险等级状况;
Considering the fuzziness and uncertainty of the information in risk assessment, a fuzzy-based assessment method is proposed to assess the development risk of the military aircraft.
针对风险评价中信息的模糊性和不确定性,提出了军用飞机研制风险的模糊综合评价方法。
The fuzzy set theory is applied to define the parameters of assessment model as triangular fuzzy parameters to establish a fuzzy risk assessment model for environmental health.
运用模糊集理论将风险评价模型的参数定义为三角模糊数,构建了水环境健康风险评价模糊模型。
A fuzzy comprehensive assessment model for the environmental risk of bio-safety laboratory was presented.
提出一种有关生物安全实验室环境风险的评价方法。
Long Pipeline; Risk Management; Construction Phase; Fuzzy Aggregative Risk Assessment.
长输管道;风险管理;施工阶段;模糊综合评价。
Because of the fuzzy comprehensive evaluation has subjective and random, we introduce the neural network to improve risk assessment model.
针对模糊综合评判法主观性强,随机性大的缺点,引入模糊神经网络算法对其加以改进。
This thesis analysis the whole construction of the large hydropower station, and establish risk assessment models, and then use the improved fuzzy synthetic discrimination to determine the weight.
本文通过对大型水电站建设进行全面分析,建立水电站建设工期风险评价模型,运用改进的模糊综合评价方法对其进行风险评价。
In addition, the risk values presented in the form of maps, reflected fuzzy imprecision of risk assessment directly.
另外,得到的风险值以地图的形式呈现,进一步直观地反映了模糊风险评估结果的模糊不精确性。
In addition, the risk values presented in the form of maps, reflected fuzzy imprecision of risk assessment directly.
另外,得到的风险值以地图的形式呈现,进一步直观地反映了模糊风险评估结果的模糊不精确性。