• The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.

    随机网络不仅可以解决桥梁施工计划的工期优化问题而且合理工期限定资源条件下,可进行施工成本优化。

    youdao

  • Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.

    车间调度优化问题作为制造企业核心一类具有时间约束次序约束以及资源约束的组合优化问题。

    youdao

  • At the same time, a corresponding particle swarm optimization algorithm is presented to solve the optimization problem of integer resource allocation. This algorithm is easy to programming.

    同时针对整数资源分配类组合优化问题提出相应离散粒子算法

    youdao

  • At the same time, a corresponding particle swarm optimization algorithm is presented to solve the optimization problem of integer resource allocation. This algorithm is easy to programming.

    同时针对整数资源分配类组合优化问题提出相应离散粒子算法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定