Simulations show that the provenance based equipment scheduling algorithm increases user satisfaction to 80% compared with the random scheduling algorithm.
实验结果表明:相对于随机调度算法,基于溯源信息的设备选择算法使得用户满意程度达80%。
To optimize node selections for grid jobs under de-centralized scheduling frameworks, the algorithm of random multi-start hill climbing is proposed.
为优化无中心式调度框架下网格作业的节点选择,提出了随机多起点爬山算法。
The paper describes the feature of the automatic generation system for examination ID CARDS, the strategy of random scheduling and the main algorithm for creating examination ID CARDS.
论述了考场考证自动生成系统的特点,随机生成考证的策略及考证生成的主要算法。
The paper describes the feature of the automatic generation system for examination ID CARDS, the strategy of random scheduling and the main algorithm for creating examination ID CARDS.
论述了考场考证自动生成系统的特点,随机生成考证的策略及考证生成的主要算法。
应用推荐