The corresponding BP algorithm, which brings its ability of processing non-linear problem into full play, is used to forecast the short-term load in future 24 hours.
利用相应的BP算法对未来24小时负荷进行短期预测,该方法充分发挥了神经网络处理非线性问题的能力。
The corresponding BP algorithm, which brings its ability of processing non-linear problem into full play, is used to forecast the short-term load in future 24 hours.
利用相应的BP算法对未来24小时负荷进行短期预测,该方法充分发挥了神经网络处理非线性问题的能力。
应用推荐