These indicators are the minimum cut sets in probabilistic risk assessment and network management.
这些指标是风险概率评估和网络管理的最小割集。
Finally, a probabilistic risk assessment method for cascading failure of power system was introduced.
最后提出了一种电力系统连锁故障风险评估方法。
And that's how in the early days before the onset of probabilistic risk assessment this was judged to be the overarching safety criteria.
这就是在早期的时候,在概率风险评估之前,这些是如何评估为首要的安全标准的。
The collection, analysis and quantification of human factor data are very important parts of human reliability analysis and probabilistic risk assessment.
人因数据的收集、分析与量化是人员可靠性分析和概率风险评价极为重要的组成部分。
Based on a probabilistic risk assessment and an expression for loss of life predictions in case of dam failure, a method of tolerable risk analysis for dam safety decision-making is suggested.
在阐述大坝风险率和生命损失评估方法的基础上,介绍了运用允许风险进行大坝防洪安全决策的方法。
The integrative risk idea of technology and economic was proposed by comparing among deterministic methods, probabilistic methods and risk methods.
综合比较了确定性方法、概率方法及风险方法,提出应采用技术与经济的风险一体化理念来开展研究。
Therefore, it is more reasonable to use a probabilistic and dynamic risk analysis method.
因此,采用一种概率性的、动态的风险分析方法更为合理。
Probabilistic schedules are created from repeatable risk registers, resulting in better project intelligence, reduced errors and replicable processes.
概率时间表从可重复的风险登记簿创建,这改善了项目智能、减少了错误并使流程可复制。
Combining with failure mode and effect analysis (FMEA), a method of safety risk analysis for software architecture on the basis of probabilistic influence diagram is proposed in the thesis.
本文结合失效模式和效果分析FMEA方法,提出一种基于概率影响图的软件体系结构安全性风险分析方法。
Studies may also include probabilistic analysis, depending on the perceived risk and cost of mitigation.
研究还可能包括概率取决于感知风险和减灾成本分析。
The probability of concrete structure cracking at early age is estimated by cracking probability and critical cracking risk with probabilistic method for a real case of concrete wall.
利用概率的方法,确定开裂概率和临界开裂风险来评价混凝土结构的早龄期开裂的可能性大小,并在混凝土挡土墙工程中应用。
Taking into account vagueness and randomness of project, fuzzy and probabilistic method for project risk evaluation is presented in this paper.
考虑到工程项目建设的模糊性和随机性,本文提出一种用于工程项目风险评估的模糊概率分析方法。
Using comprehensive probabilistic method of multiple factor theory to estimate the earthquake risk on Urumqi urban districts and suburban mining area.
采用多因子综合概率法估计了乌鲁木齐市区及矿区的地震危险性。
The risk importance of human events in nuclear power plant probabilistic safety assessment models was analyzed.
在核电站概率安全评估模型的人类活动的风险的重要性进行了分析。
The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches.
风险指引管理是确定论与概率论方法相结合的一种新的安全管理模式。
The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches.
风险指引管理是确定论与概率论方法相结合的一种新的安全管理模式。
应用推荐