• China will start building its first large nuclear-power reactor with home-developed 'fourth generation' technology in 2012-13, a senior engineer involved in developing the system said.

    中国原子能科学研究院实验快工程部总工程师,2012- 2013年,中国开始利用自主研发第四技术建造中国首个大型核电反应堆。

    youdao

  • Service engineer of maker shall carry out automatic control system generator set (auto power station) test.

    对于自动化电站发电机自动控制功能厂商服务工程师完成。

    youdao

  • Assist the Engineer finish daily task, so that the power supply system can running smoothly and all the electric equipments can work safely.

    协助工程师完成每天工作分派,确保供电系统可靠运作以及所有电器设备、电话系统安全运行

    youdao

  • Work with NPD manufacturing engineer on line setup, specially on power supply, pneumatic system and ESD system.

    新产品导入工程师一起完成生产线布局建立特别是防静电系统。

    youdao

  • Understanding this handbook will greatly assist the design or maintenance engineer in achieving the balanced system cleanliness that is the cornerstone of fluid power reliability.

    了解本文内容很大程度上有助于设计维护工程师获得稳定的系统清洁度,而这正是液压传动可靠运行基础

    youdao

  • Understanding this handbook will greatly assist the design or maintenance engineer in achieving the balanced system cleanliness that is the cornerstone of fluid power reliability.

    了解本文内容很大程度上有助于设计维护工程师获得稳定的系统清洁度,而这正是液压传动可靠运行基础

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定