Consider having layers of analysis if you plan to reuse aspects of your system model in future projects.
如果你计划在将来的项目中重用你的系统模型的某些部分,考虑对分析模型进行分层。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
The structure form, calculating model, loads and boundary condition, structure analysis and member section choice are introduced. Superiority of the used plan is demonstrated at last.
就结构选型、计算模型、荷载与边界条件的选取、结构分析与截面选择等方面进行了介绍,并对结构方案的优越性进行了论证。
We divided into two models, Strategic Analysis model and Campaign Plan model.
共分为两个模型,即战略解析模型和作战计划模型。
The test result analysis of modified plan model shows the optimal design is reasonable and can be extensive.
通过对修改方案模型试验结果分析,得出修改方案改进了原方案中存在的不足,优化合理,是可以采用的。
This article fourth part teacher's actual project Ankang "JiangnanYiping Garden", from the practice angle to the community plan design's model, the process, the method carries on the analysis.
本文第五部分在前面部分基础上,通过设计参与者及其使用行业工具并以住区策划及空间设计方法为重点进一步对住区设计方法进行提炼和总结。
In accordance with the research and analysis on the features of refined oil distribution plan, the paper presents its mathematic model and designs an effective solution based on heuristic algorithm.
通过对成品油配送计划的分析,提出了成品油配送计划两阶段编制方法并建立了每个阶段的优化模型,同时对模型的求解方法进行了分析探讨。
And at the same time, according to the simulation analysis of the overall model, choose the best plan of railway operational model, and give the best number of container truck.
同时根据整体模型的仿真分析,选择最优的铁路作业模式方案,并给出了集卡最佳配置数量。
In accordance with the research and analysis on the features of refined oil distribution plan, the paper presents its mathematic model and designs an effective solution based on heuristic algorithm.
通过对成品油配送计划特点的研究与分析,建立了成品油配送计划编制的数学模型;并设计了模型求解方案;通过对实验结果的分析,证明本文设计的算法快速、有效、稳定。
Finally base on the analysis of each risk sources, it establishes the hierarchy risk analysis model and emergency plan management.
最后在对各种风险源分析评价的基础上,建立通信工程建设监理项目风险层次分析模型及预案管理。
Finally base on the analysis of each risk sources, it establishes the hierarchy risk analysis model and emergency plan management.
最后在对各种风险源分析评价的基础上,建立通信工程建设监理项目风险层次分析模型及预案管理。
应用推荐