Additionally, OptiVision will simplify order scheduling and overall workflow management.
此外,OptiVision还将简化订单计划以及整体生产流程管理。
It differs from the order scheduling that produces job scheduling and embodies rapid response to customers need and advances enterprises agility and rapidity in response to customers need.
它不同于生成作业计划的订单排程,体现了快速响应客户需求,增加了企业对客户需求响应的敏捷性与快速性。
The OOAD course is usually taken after taking the software engineering course, although some students reverse the order due to scheduling constraints.
OOAD课程通常在软件工程课程之后进行,但也有一些学生由于时间安排的限制颠倒了这一顺序。
You can utilize a scheduling module that runs policies at various intervals in order to conform to your particular maintenance window.
您可以利用计划任务模块,以不同的时间间隔运行不同的策略,以满足您特定的维护窗口。
In terms of scheduling, the dependencies imply an order in which each of these elements can be implemented.
在进度安排方面,依赖关系指出每一个组成要素被实现的顺序。
In order to give you more flexibility for scheduling options, requirements from RequisitePro are imported to the same level.
为了使您更加灵活的使用列表选项,来自RequisitePro的需求被导入到同一个级别中。
Finally, the robust optimization modeling technique is applied in the problem of elevator group scheduling in order to supply a new method for the uncertain problem of traffic flows.
最后,将稳健优化的建模理念应用到电梯群组调度问题中,为解决交通流不确定问题提供了新的思路和方法。
The way how these tasks are activated (e. g. the activation order) is called scheduling of the tasks.
这些任务如何活动的方法(举例来说激活命令)被称作任务的时序安排。
During scheduling, in order to save processors, the nodes were allocated to the used processors as far as possible without changing the scheduling length.
调度中,为节省处理器,在不改变调度长度的情况下,将任务尽可能地分配到已用处理器上。
In addition, the frame can see these people continue to beat people already fell to the ground, and the police because of scheduling problem, not play the role to maintain order.
此外,画面中也可以看到这些人继续追打已经跌倒在地的民众,而现场警力因为调度问题,并未发挥该有的维护秩序角色。
A queue of new messages (or a group) within a system that are awaiting processing. The main scheduling routine will scan them along with other queues and order them into processing in order.
在系统中等待处理的一组或一队列新信息,主调度程序对该队列及其它队列进行扫描,使之顺序进入处理状态。
Generally speaking, the non-volume-related activities consist of many supporting activities such as materials handling, set-ups, production scheduling, buying or selling order filling, and etc.
一般说来,与数量不相关的作业包括像材料处理、生产准备、生产计划、购销定单的填制等支持性作业。
Diagnostic units need support in the areas of work scheduling, order entry, transmission and presentation of results and accounting.
诊断单位需要支持在区域内的工作日程安排,登记顺序,输送解释结果和帐目。
In order to make the multitask scheduling be realized by system management scheduler of the Operating system, modified solutions for join and fork models are presented.
我们对合并和分叉模型进行了修改,使多任务系统可以方便地通过操作系统管理程序进行调度。
Introduced a mechanism to implement distributed scheduling for the CANBus resource in order to meet the requirement of a dynamic distributed real-time systems.
介绍了一种对CAN总线网络资源进行分布式调度的机制,满足分布式实时系统的实时性要求。
It takes processing time into account besides the deadline and resource requirement of the task sets in order to reduce scheduling backtracks and increase effectiveness.
该算法适用于可并行任务,并在考虑到了任务集的截止期和资源因素基础上,加入了运行时间因素,达到了减少调度返回次数以及提高有效性的目的。
In order to realize intellectual scheduling step by step, the electric network has been reformed and interconnected to implement centralized management and increase the automation level.
改造供电系统,实行联网,集中管理,提高电网自控水平,逐步实现智能调度。
Different resource scheduling algorisms are designed for different computing expectation in order to achieve flexible and efficiency grid resource schedule.
针对不同的“计算期望”,设计了不同的资源调度算法,以实现高效,灵活的网格资源调度。
An integrated optimization model of production planning and scheduling for batch production was constructed in order to deal with various batch production.
针对多品种批量生产类型,建立了调度约束的生产计划与调度集成优化模型。
In order to get the good result, authors have made research on the algorithms of the Weighted Round-Robin Scheduling, improved Self-adaptive Scheduling in the process of the campus grid load-balance.
为了得到较好的实验结果,文章还对测试中负载均衡的轮叫调度、改进的自适应调度算法的应用进行了研究。
In order to carry out dynamic task scheduling effectively, the method of name and orientation is provided for tasks of distributed measurement and control system.
为了有效地实施动态任务调度,需要对分布式测控系统中的每一个任务进行命名与定位。
In order to achieve this, scheduling models should be set up for hard real-time CORBA systems with static priority and periodic tasks.
为了更好地定量分析可预测性,需要为以固定优先级方式调度的、周期性任务的硬实时CORBA系统建模。
A proper scheduling algorithm of the messages can be used in order to avoid collisions and traffic will be completed within a specific deadline.
为了保证通信数据的传递在指定的截止时间时限内完成,避免产生冲突,可以采用一些合适的消息调度算法。
In order to improve the level of the vehicle scheduling management, we develop a system which can be used in the vehicle scheduling and management after study.
在研究的基础上开发了一种可用于车位调度和管理的停车场调度管理系统,旨在通过计算机和自动化设备提高车辆调度管理的水平。
Since the tape libraries have very poor random access performance, it is critical to study random I/O scheduling strategies and algorithms in order to improve the performance of tape library.
由于磁带库随机存取的性能很差,需要研究有效的随机I/O调度策略和算法以改善其在线存取的效率。
This system chooses scheduling policy of flow depending on user's Numbers of back-order, and delivers the back-order into the user in fixed time and place.
该系统依据用户提交的订货数量不同采取不同的物流调度策略,从而能在指定时间和地点迅速将订货送到用户手中。
In order to the operating system teaching and counselling has provided the beneficial help, deepened to the processor scheduling theory further understanding.
为操作系统的教学和辅导提供了有益帮助,加深了对处理器调度理论的进一步理解。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
Task scheduling aims at scheduling a set of partially ordered computational tasks onto a multiprocessor system by a given strategy in order to obtain a better system performance.
任务调度问题是指根据一定的调度策略,把一组并行处理的任务按规定的时序分配到系统的多个处理机节点上,以期获得较好的系统执行性能。
Task scheduling aims at scheduling a set of partially ordered computational tasks onto a multiprocessor system by a given strategy in order to obtain a better system performance.
任务调度问题是指根据一定的调度策略,把一组并行处理的任务按规定的时序分配到系统的多个处理机节点上,以期获得较好的系统执行性能。
应用推荐