归纳总结了确定嵌岩灌注桩的承载力方法。
Method of capacity of socketed piles are determined to bring together.
无桩尖管桩锤打过程易造成管桩移位、内伤、断桩、嵌岩差、持力层锚固长度小。
Shift, internal injury, breaking, bad imbedded in rock, as well as short anchorage distance etc.
无桩尖管桩锤打过程易造成管桩移位、内伤、断桩、嵌岩差、持力层锚固长度小。
Shift, internal injury, breaking, bad imbedded in rock, as well as short anchorage distance etc.
应用推荐