Water test of all boiler water.
锅炉水质检测。
It is recommended that water test be performed prior to the dynamic drive.
在这里推荐雨淋试验安排在动态试验之前进行。
This tub of water is a way to test learning and memory.
这一缸的水是用来测试学习和记忆。
Don't test the depth of the water with the both feet!
不要两脚一起试水深!
Flexibility and hosing test for small water tight hatch cover(water tight door and window).
水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。
We suggest to do sealed test before trail run after water pipe was linked.
水管连接好后,我们建议在试运行前应做密封性试验。
Flexibility and hosing test for small watertight hatch cover (water tight door and window).
水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。
After this test, we can obtain the result of assuring the water quality after filtration.
通过试验,得出保证滤后水水质的试验结果。
Is a water break test performed every shift to ensure quality of pre-clean?
槽液测试是否每班测试一次以确保预清洁品质良好?
It can also supply a list of certified LABS to test the water for you.
它也可以提供经认证的实验室名单,以测试你的水。
Repeat the leak test in the water bath.
在水槽中重复泄漏测试。
Fill system with Dl water and perform leak test with circulation pump.
向系统中填充去离子水并用循环泵测漏。
How do you test the temperature of the baby's bath water?
你该如何测试宝宝洗澡水的温度?。
Do several partial water changes and test for Nitrites.
局部换水,并测试亚硝酸含量。
The single leg rupture test in slam water and calm wave.
在静水和汹涛中单腿破断试验。
Would you test the heat of the water before I bathe the baby?
我给婴儿洗澡前请你试一下水温好吗?。
The high quality mineral water has passed the state - level test.
优质矿泉水已通过国家级鉴定。
After salt water spray test, their hardness did not change.
经盐水喷雾试验后,其对于硬度并不会有所影响。
The water should be let out if the trail run will not be done at once after pressure test.
如压力测试后如不立即试运行冷却器,应将冷却器的水排干(见第5项停用)。
Laboratory fill test: fill water content, grain analysis and specific gravity test were tested.
填土的室内试验:填土含水量测定、颗粒分析和比重测定。
During the test, the women were immersed in a lightless tank of cold water.
在测试过程中,妇女们被浸在放有冷水的暗箱里。
Then carry out the test at the rated water overpressure.
然后在额外超水压中停止测试。
Please dive in first and test the temperature of the water.
先把手插在水里试试水温。
To test system functions, please open the valves and drain water out of them.
开启阀门排水来检验系统功能。
This program USES to test for fresh water generator of 1000teu ship.
本程序适用于1000teu集装箱船造水机部分的试验。
This program USES to test for fresh water generator of 1000teu ship.
本程序适用于1000teu集装箱船造水机部分的试验。
应用推荐