This would be the last configuration of the switch step.
这将是转换步骤的最后配置。
Step four: the write system call returns, creating our fourth context switch.
步骤四:系统调用返回,导致了第4次上下文切换。
Switch to the Business Monitoring perspective and open the folder you specified in step 2.
切换到BusinessMonitoring透视图,打开步骤2中指定的文件夹。
Step 5: Look for an emergency exit or emergency door release switch.
寻找紧急出口或紧急开门按钮。
The time has come for the first big step: a switch to a two-child policy.
时间已上了第一个大台阶:开始转换成两个小孩的政策。
Multifunction with 5 step switch.
多功能5种烹饪程序。
Step 5 Switch the target physical standby database role to the primary role.
转换目标逻辑备用库角色为主库角色。
Step 5 Switch the target physical standby database role to the primary role.
转换目标逻辑备用库角色为主库角色。
应用推荐