• Cost control of project construction?

    施工项目成本控制

    youdao

  • The project construction period is expected to 8 months.

    项目建设期预计8个月

    youdao

  • In the future the pilot project construction shall continue.

    今后继续加强试点建设工作。

    youdao

  • During the project construction , quality is in the first place.

    工程建设过程中,质量处在第一位的。

    youdao

  • So owner should deal with preparation for project construction;

    为此,业主做好工程项目的前期准备工作;

    youdao

  • Bidding for project construction supervision is of a new business.

    投标方式取得工程建设监理任务一项新型业务

    youdao

  • It is the example which the similar project construction may refer.

    同类工程施工参考实例

    youdao

  • Abstract: : the project construction quality control is multifaceted.

    摘要项目建设质量控制多方面的

    youdao

  • The contract management is the core of project construction management.

    合同管理工程建设项目管理核心

    youdao

  • The quality of garden landscaping is the core of the project construction.

    园林绿化工程建设质量项目建设核心

    youdao

  • Activity-Based Costing; Engineering Project Construction; Cost Management.

    作业成本法;工程项目施工;成本核算;成本管理

    youdao

  • Project Construction Tribune New Concept and New Method for project planning.

    工程设计的概念、新方法

    youdao

  • The technology have generally significance to the similar project construction.

    技术类似工程施工普遍指导意义

    youdao

  • Summarizes the HVAC system design, equipment selection and project construction.

    总结了工程系统设计设备选择工程施工

    youdao

  • Hydro project construction will impose a certain negative impact on environment.

    水利水电工程施工过程中将周围环境产生一定不利影响

    youdao

  • Obviously, basic telecommunication network project construction are no exception.

    显然基础通信网络工程建设不能例外

    youdao

  • The foundation construction is a key part of transmission line project construction.

    基础施工送电线路工程施工重要环节

    youdao

  • Establishes the construction drawing budget, definite project construction cost basis.

    编制施工图预算确定工程造价依据

    youdao

  • In order to further promote the pressure-meter test, and serve for project construction.

    以便进一步推广试验工程建设服务

    youdao

  • The original construction program is scheduled to project construction period is 3 years.

    原来建设项目预计项目建设期3

    youdao

  • In this paper, the main points of the bridge project construction cost control in detail.

    本文主要桥梁工程施工成本制约要点做详细探讨。

    youdao

  • Financial certificate to the project construction unit by the related financial authority.

    金融部门项目建设单位出具资信证明

    youdao

  • The intertidal zone and the developable land can be backfilled for the project construction.

    滩涂、荒地全部都可以通过回填进行造地,用于承接项目建设。

    youdao

  • To consolidate supervision management of project construction and responsibility of supervisors.

    三是加强建设监理管理,强化监理责任

    youdao

  • The dynamic consolidation and deep mixing method ( DMM ) are very common in project construction.

    其中强夯法深层搅拌工程建设常用的加固方法。

    youdao

  • The project construction cost control passes through the entire engineering construction process.

    工程造价控制贯穿整个工程建设全过程

    youdao

  • For similar project construction has certain guiding significance to the construction and reference.

    类似工程施工具有一定施工指导意义借鉴作用

    youdao

  • For similar project construction has certain guiding significance to the construction and reference.

    类似工程施工具有一定施工指导意义借鉴作用

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定