The result shows that the method is feasible and it has good removing capacity of SO_2.
结果表明,该方法是可行的,效果良好。
At the same time that used in this project is feasible and safe bearing capacity.
同时证明了本工程所采用的地基承载力是安全可行的。
At the same time that used in this project is feasible and safe bearing capacity.
同时证明了本工程所采用的地基承载力是安全可行的。
应用推荐