论述了工程组织的难点,工程各项目实施阶段的控制。
Difficult point of organizing construction project and controlling construction stage are discussed.
在第二节中分阶段讲述了呼叫中心项目实施的全过程。
In the second section, the process of the Call-center project is described by stages.
本文主要论述了建筑智能化项目实施过程中各个阶段的控制和管理过程。
This is the introduction that control and management during the period of intelligent building item.
本文主要论述了建筑智能化项目实施过程中各个阶段的控制和管理过程。
This is the introduction that control and management during the period of intelligent building item.
应用推荐