• Or, you can create a simple scheduling front end that is integrated in a non-IBM environment.

    或者可以创建一个简单集成ibm环境的调度前端

    youdao

  • Work Management - plan, cost, budget, resources and scheduling of project and non-project work.

    工作管理(Work Management)——计划成本预算资源项目时间安排以及非项目的工作。

    youdao

  • In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.

    方法调度调整过程可以同时处理关键通路非关键通路上节点

    youdao

  • The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    考虑并行加工机上不同尺寸工件调度问题目标极小最大完工时间。

    youdao

  • Generally speaking, the non-volume-related activities consist of many supporting activities such as materials handling, set-ups, production scheduling, buying or selling order filling, and etc.

    一般说来,与数量不相关的作业包括材料处理生产准备、生产计划购销定单的填制支持性作业。

    youdao

  • Once the non-functional requirements are identified, scheduling and resource requirements need to take care of these as well.

    一旦功能性需求确定下来,就需要注意进度资源需求。

    youdao

  • Vehicle scheduling problem with non full load is a fundamental problem of vehicle scheduling problem. Because it is a typical NP hard problem, traditional algorithms usually are not satisfied.

    满载车辆调度问题车辆调度问题中的基本问题,由于是一个典型的NP难题传统方法求解结果往往不能令人满意。

    youdao

  • Non-electrical quantity detecting system is a new auto-control system that adapt automation of electric scheduling, self-service and integrating automatism in substation.

    主变非电量测控系统适应电力调度自动化变电站实现无人值班综合自动化一种新型自动测控系统。

    youdao

  • Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.

    当考虑发电机报价曲线的影响时,发电计划偏差优化问题一个高维离散约束条件复杂非线性最优化问题。

    youdao

  • This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.

    采用网络理论构造平行流水作业连接图模型,提出了采用群算法求解平行流水作业计划问题,以及求解过程可行路径表的建立方法

    youdao

  • This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.

    采用网络理论构造平行流水作业连接图模型,提出了采用群算法求解平行流水作业计划问题,以及求解过程可行路径表的建立方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定