The structure characteristics of the main body, hot stove and clean catching system of Angang new No. 4 BF and the production practice of which after blow-in are presented.
介绍了鞍钢新4号高炉、热风炉及除尘系统的结构特点及开炉后的生产实践。
The burning system of hot stove and equipment of waste heat recovery is studied. A new method of waste heat recovery with fast heat storage room is put forward.
通过对高炉热风炉燃烧系统和现有烟气余热回收装置的研究,提出了固定蓄热式烟气余热回收利用新方法。
The burning system of hot stove and equipment of waste heat recovery is studied. A new method of waste heat recovery with fast heat storage room is put forward.
通过对高炉热风炉燃烧系统和现有烟气余热回收装置的研究,提出了固定蓄热式烟气余热回收利用新方法。
应用推荐