To introduce the mill setup computer system of Handan CSP. The control part and non control part main functions of the mill setup computer are described.
介绍了邯钢连铸连轧厂的轧机设定计算机的控制和非控制程序的主要功能。
Investigates the width prediction and setup of strip in rolling passes in a hot strip mill.
研究带钢热连轧生产线中成品带钢的宽度预报与设定。
ABSTRACT The setup of rolling parameters is key to producing of skin pass mill for good quality and high produce.
平整机生产过程中,合理地设定轧制规程是使平整生产能够达到优质、高产、低消耗的关键。
Operation time: Complete in 2 minutes including setup time for 13mm 2 flutes end mill generally.
操作时间:通常情况下,1个13mm直径的2槽铣刀可以在2分钟内完成刃磨(含设定时间)。
Operation time: Complete in 2 minutes including setup time for 13mm 2 flutes end mill generally.
操作时间:通常情况下,1个13mm直径的2槽铣刀可以在2分钟内完成刃磨(含设定时间)。
应用推荐