In this paper, a reasonable method of dynamic programming is brought out to solve this problem.
论文针对这个问题提出了利用动态规划方法基于句子相似矩阵进行求解的方法。
On the basis of minimax algebra theory, this paper provides an algebra method of solving countable stages decision problems in the dynamic programming.
本文根据极大极小代数理论,给出了一种用以求解动态规划中有限多阶段决策问题的代数算法。
The method and example of pass optimization design of high speed wire rod finishing mill by dynamic programming with minimum total tension coefficient are described.
阐述了以动态规划法按最小总张力系数对高速线材轧机精轧机组孔型进行优化设计的方法与实例。
By dynamic programming method, authors put forward a decisive method of mining procedure of large surface mining deposits.
本文运用动态规划方法。提出了一种确定特大型水平、近水平露天矿田开采程序的方法。
Based on the principle of dynamic programming, a mathematical model of sequencing programming of cascade hydropower stations is established and its computation method is presented.
本文根据动态规划原理,建立了梯级电站开发程序优化的数学模型,提出了相应的计算方法。
For seeking a method to solve the model, it introduced blur math method, dynamic programming method, the way of optimization and integer programming method etc.
对模型的求解问题,本文采用模糊数学法、动态规划法、最优路方法、整数规划法等多种方法进行深入的研究。
Dynamic programming is a method of optimization, which is particularly applicable to multistage decision processes.
动态规划是一种最优化方法,特别适用于多阶段决策。
In this paper a resolving method of multivariate dynamic programming model to mid and long term optimum operation for large scale hydropower system is studied.
本文研究一种混联水电站水库群中长期优化调度的多维动态规划模型的求解方法。
This paper is to introduce another solution to operation method expressed in tables of transportation problem with the knowledge of Gaussian elimination and dynamic programming.
用高斯消去法和动态规划的知识介绍对运输问题表上作业法的另一种解法。
In addition, the programs of the traditional dynamic substructure method are complex by programming and running. Therefore it is unsuitable to be used for the real projects.
同时传统的动态子结构法在编程实现上非常复杂,不利于实际工程的利用。
With the help of dynamic programming method, the multistage decision problem on surface water and groundwater is analysed in this paper.
本文借助动态规划理论,分析了地表水与地下水统筹管理的多阶段决策问题。
Based on the theories of dynamic programming, an optimum method has been worked out in this paper to solved the problem for water level control of main drainage channel and an example has been given.
本文应用动态规划理论,探讨了一个解决排水干道水位控制优化问题的方法,并附有计算实例。
According to the relation of center point and neighboring points, a novel method is put forward using dynamic programming and grey relational analysis to find a best seam line.
根据中心像元与周围像元之间的临近像元效应,提出了基于动态规划与灰关联分析的最佳拼接线检测算法。
By analyzing the process decomposition of complex product, the bi-level dynamic programming model is setup, and realization method is given.
针对复杂产品设计过程动态分解问题,本文提出了一个基于任务期限的两层动态规划模型,并研究了模型的实现方法与技术。
Global chaining algorithm recovers disconnected fragments of whole objects using dynamic programming method, and obtains good performance in curvilinear detection from strong noise.
线段全局链算法利用动态规划方法来恢复全局物体中的不连续片断,在强噪声中的曲线检测方面获得了较好的效果。
The dynamic programming is a branch that it is multi-stage decision-making process of solving a mathematical optimization method.
动态规划是运筹学的一个分支,它是解决多阶段决策过程最优化的一种数学方法。
The cam contour curve was obtained through coordinate transformation method. It offers references for dynamic simulation and the programming of numerical-control machining for cam mechanism.
利用坐标变换的方法得到的凸轮轮廓线可为凸轮机构的动力学仿真和数控加工编程提供依据。
This method combined the ameliorated grid degenerate and dynamic programming, it can solve the problem of time delay in path planning with sudden appearing threats.
提出采用一种结合三角网格退化、变域动态规划以及航迹优化的方法来解决突发威胁下的航迹规划问题。
This paper discussed a class of social economic system models structure change point by dynamic programming method, which are illustrated by examples.
本文用动态规划方法讨论了一类社会经济系统模型结构变化点的问题,并通过实例进行了验证。
The initial segment is determined by detecting the distance changes of the critical feature parameter vector. With the dynamic programming method, the segmental accuracy is improved.
该算法通过检测临界带特征矢量参数的距离变化确定初始分段边界,结合动态规划方法提高分段的准确性。
This paper adopts dynamic programming method and greedy method to solve such problems, then analyzes and compares the differences of two algorithms.
采用动态规划法和贪心法对该问题进行求解,分析和比较这两种算法在求解同一问题时的差异。
According to the HNPC model, the characteristics of construction process are explained. The fuzzy dynamic programming method is introduced into the process control and the realization is presented.
根据HNPC模型的特点,阐明了建筑施工进度计划的特征,把模糊动态规划方法引入到建筑施工进度计划调整中,并给出了具体实现方法。
Using dynamic state programming method, we firstly divide the period of mineral resources planning into phrases reasonably, then establish mathematical model of planning target.
应用动态规划方法合理地划分矿产资源规划阶段,建立规划目标数学模型,可以较好地改进传统矿产资源规划的不足。
The application of graph theory, dynamic programming, neural networks, MCST method, constrained derivatives, etc. to pipe network programming were recommended in details.
详细介绍了图论法、动态规划法、神经网络法、MCST法和约束导数法等在城市天然气管网规划中的应用。
There are many methods to solving interior economical operation of the hydroelectric power such as equal incremental equations method, dynamic programming and non-linear programming.
求解水电厂厂内经济运行的方法很多,如等微增率法、非线性规划和动态规划法等。
In this paper, a recurrence formula is given, by use of dynamic programming method, to solve the problem of linear algebraic equations with symmetric martrix element of...
本文用动态规划方法对一类对称的矩阵元三对角型线性方程组给出一种递推算法。
According to features of section steel CARD, this paper has introduced dynamic programming method to make roll pass optimum design.
根据型钢产品计算机辅助孔型设计c ARD的特点,本文采用了动态规划法进行产品优化设计。
According to features of section steel CARD, this paper has introduced dynamic programming method to make roll pass optimum design.
根据型钢产品计算机辅助孔型设计c ARD的特点,本文采用了动态规划法进行产品优化设计。
应用推荐