• The initial core loading program, nuclear safety and nuclear monitoring during the core loading and temporary instrumentation system for Qinshan NPP is described.

    本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。

    youdao

  • Testing purpose, model design principle, testing case, loading program, strain and deformation test point arrangement of the first Zhongshan Bridge test model are introduced in detail.

    介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。

    youdao

  • The testing purpose, model design principle, testing case, loading program, strain and arrangement of deformation test point of the special-shaped arch bridge test model are introduced in detail.

    介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。

    youdao

  • The testing purpose, model design principle, testing case, loading program, strain and arrangement of deformation test point of the special-shaped arch bridge test model are introduced in detail.

    介绍了该桥模型试验的目的、模型设计原则、测试工况、加载方案以及应变和变形测点布置情况等,给出了几个主要荷载工况下模型试验的主要结果。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定