• Windows and insulation came next, and then prefabricated bathrooms and kitchen modules were installed. Finally the unit was lifted by crane into position on the building.

    下一步生产隔热层,之后安装预制浴室厨房模块最后这个单元起重机吊起来放置在这座建筑的相应位置上。

    youdao

  • Windows and insulation came next, and then prefabricated bathrooms and kitchen modules were installed. Finally the unit was lifted by crane into position on the building.

    下一步生产隔热层,之后安装预制浴室厨房模块最后这个单元起重机吊起来放置在这座建筑的相应位置上。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定