Figure 2 highlights the new and dramatic, high-risk efforts to get to smart grid and smart meter efforts off the ground and provide new levels of control and predictability.
图2突出显示了新的且令人印象深刻的高风险努力,实现了智能电网和智能电表,提供了新级别的控制和预测。
School of material science and engineering, Jinchuan company. Ground pressure activity disciplinarian and control method on the bad position of roadway at No. 2 mine, 1983.
北京科技大学,金川公司。金川二矿区不良岩层巷道地压活动规律及控制方法的研究。
One scene of ERS-2 SLC imagery was selected as major test data and Ground Control Points (GCP) were manually collected.
从中选择了一景ERS-2 SLC数据作为主要实验数据,并手工采集了控制点。
The encoder assembly (1) is respectively connected with a change-over switch (2), a combining beam switching control (3), the decoder assemblies (4) and (14), a storage battery (13) and the ground.
所述编码器组件(1)分别接向转向开关(2)、组合变光开关(3)、译码器组件(4)和(14)、蓄电池组(13)和地。
The encoder assembly (1) is respectively connected with a change-over switch (2), a combining beam switching control (3), the decoder assemblies (4) and (14), a storage battery (13) and the ground.
所述编码器组件(1)分别接向转向开关(2)、组合变光开关(3)、译码器组件(4)和(14)、蓄电池组(13)和地。
应用推荐