• The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.

    分别介绍了该缆索吊的缆索系统塔架系统、系统锚固系统设计计算施工方法

    youdao

  • The design, calculation and construction method for cable crane system, main pylon system, fasten and hang system and anchor system are introduced respectively in this paper.

    分别介绍了该缆索吊的缆索系统塔架系统、系统锚固系统设计计算施工方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定