Through the comparison of the construction schemes the dewatering with open drain, replacement and dynamic compaction are used for the treatment of saturated silt ground under groundwater.
对地下水位以下较深的饱和粉土地基处理,经过方案比选,采用明沟降水,并进行部分换填加基坑内强夯的处理方法。
Through the comparison of the construction schemes the dewatering with open drain, replacement and dynamic compaction are used for the treatment of saturated silt ground under groundwater.
对地下水位以下较深的饱和粉土地基处理,经过方案比选,采用明沟降水,并进行部分换填加基坑内强夯的处理方法。
应用推荐