In addition to simplifying the site optimization process, the API might also make it simpler for companies to conduct in-house testing, reducing both the cost and time of optimization.
除了简化网站优化过程外,这个API还简化了公司进行内部测试的过程,减少了优化所需的成本和时间。
These projects value time to market and cost optimization above the long-term use and flexibility of the application.
相对于长期的使用和应用的灵活性来说,这些项目更看重市场以及费用。
An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.
在时间-费用关系为非线性的假设下,建立求网络计划最低成本日程的优化模型。
Route optimization problem in multimodal transport directly influences the freightage cost, freightage time and freightage quality.
多式联运路线优化问题直接关系到货物运输的费用、时间和运输质量。
Two of optimization guidelines are minimal communication cost and minimal response time.
使通讯费用最小,响应时间最短是两个优化准则。
The effects of damper technical parameters on its power characteristics must be determined in the design process to save optimization time and reduce development cost.
在防振锤的设计过程中,需确定防振锤各技术参数对防振锤功率特性的影响程度,以节省优化时间,减少试制费用。
But too complex and aggressive optimization algorithm will cost much compilation time and resources.
而复杂的编译优化算法需要耗费大量的编译时间和资源。
The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
There are two methods of database query optimization: cost-based and response time-based query optimization, all of which can improve the efficiency of complex query.
数据库查询优化包括两方面,基于代价的查询优化和基于响应时光的查询优化,可以有效地提高庞杂查询的效力。
The shortage of the current optimization models and solution methods were analyzed, and the main factors affecting the quality, building time and cost of prototypes were discussed.
分析了目前分层方向优化模型和求解方法中的不足,讨论了影响原型制作质量、制作时间和制作成本的主要因素。
According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
The paper applies ant colony algorithm to network planning time-cost optimization problems, thereby getting a accurate, comprehensive and efficient solution optimization method.
文章将蚁群算法应用于计划调度的工期-费用优化问题之中,得到一种精确、全面,求解效率高的优化方法。
CONWIP integer programming model is built, and its optimization goal is machine setup cost and inventory cost and production flow time. In order to solve this model, the heuristics are provided.
以机床加工准备成本及工件库存成本和加工流动时间为优化目标,建立了CONWIP系统整数规划模型,并提出了求解问题的启发式算法。
Traditional production management has the difficulties in managing the whole production process, and what's more, it's hard to realize the whole optimization in both time and cost.
传统的生产管理方式很难全面管理整个生产过程,更难以实现生产过程在时间、成本上的综合优化运行。
How to carries on the comprehensive optimization and the management of cost, time, quality and security, is another challenge to the integrated management of construction project objects.
如何对成本、工期、质量和安全进行全面的优化和管理,是对施工项目目标集成管理所提出的又一挑战。
Then according the timeliness, a kind of local route optimization scheme is designed. Although it can reduce the time of transmission, yet the cost of binding increase.
然后根据通信实时性等要求,设计一种局部路由优化方案,该方案减少了报文传输时间,但可能导致绑定更新开销的增加。
At present, the study of the time-cost optimization is generally in the CPM network, and the traditional CPM network is not in line with the actual situation of the project.
目前,时间-费用优化问题的研究一般是在CPM网络中进行的,传统的CPM网络不符合项目进行过程中的实际情况。
Meanwhile, the optimization also includes reducing the computational complexity of the query optimization of trimming, and query results combination which considered both space and time cost.
同时,优化中还包括降低计算复杂度的查询裁剪的优化,以及兼顾空间和时间开销的查询结果合并方式。
The optimization of materials handling system is propitious to minimization of time and cost during the handling course, and it also decreases the intensity of Labour and increases work efficiency.
物料搬运系统的优化有利于搬运过程中成本最低化和时间的最小化,同时降低劳动强度,提高人员工作效率。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
Then the problems of wit choice for cutting parameters are discussed. At the same time, optimization aims are found. They are the high productivity and low cost.
讨论了切削参数的智能化选择问题,进而确定了建立优化数学模型的优化目标,即与企业生产相一致的经济指标最高生产率和最低成本。
As to optimization of the network technique, make emphasis on "time-cost optimization" and set up mathematic model using Linear Scheduling method.
在进度计划的优化方法方面,仅以“工期-成本优化”为例,用线形规划方法建立了求解模型。
This article introduces the thought and method of highway engineering time-cost optimization, and puts forward the CAD software design scheme.
介绍了公路工期—成本优化的思路和方法,并提出了公路工程工期—成本优化的CAD软件设计方案。
Based on the market participants' adjusting biddings, real-time congestion management is modeled as an optimization problem with the objective of minimizing total adjusting cost.
基于市场成员的调整报价,实时阻塞管理问题被描述为调整成本最小的优化问题。
Then, optimization-based scheduling of pumped storage units with the concept of marginal unit and marginal cost is described across time intervals in the dispatch period.
然后,给出网流法在调度周期上跨时段采用边际机组与边际成本概念优化运行方式的算法。
Weighted value of safety quality cost time in most cases must be regarded for trade-off optimization, but it is difficult to be determined for its uncertainties.
工程施工中安全、质量、费用及工期的综合优化,在许多情况下需要涉及权重的确定,但权重值常很难精确确定,具有不确定性。
Weighted value of safety quality cost time in most cases must be regarded for trade-off optimization, but it is difficult to be determined for its uncertainties.
工程施工中安全、质量、费用及工期的综合优化,在许多情况下需要涉及权重的确定,但权重值常很难精确确定,具有不确定性。
应用推荐