Change control management is an integral part of operations.
更改控制管理是必不可少的操作部分。
Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.
更改控制管理可以提供灵活性,同时有助于实现严谨的工程原则。
Good and continued communication between the operations team and the development team will also benefit from change control management.
更改控制管理还有助于在操作团队和开发团队之间实现良好、持续的交流。
This approach has many names: configuration management, change management, source code control, library control, version control and so on.
这种方法有很多名称:配置管理、变更管理、源代码控制、库控制、版本控制等等。
In these organizations, automation, process control, change management, and team coordination are necessities to keep development on track.
因此在这些企业中,自动化、流程控制、管理变化、和团队协调对于保证开发质量是十分必要的。
At the same time developers want to use easier and leaner change and configuration management solutions with less overbearing process, restriction, and control.
同时开发人员想利用更少的过程,约束以及控制,而采用更简单更倾向于变更和配置管理的解决方案。
Once management accepts the importance [of keeping design debt under control], the organization's entire way of building software can change.
一旦管理层接受了不断控制设计债这种理念,那么公司构建软件的所有方式都会发生改变。
Version control systems are typically used for file backup, parallel development, and change management.
版本控制系统通常用于文件备份、并行开发和变更管理。
These products provide not only version control, but also change tracking, workflow support for change management, and full asset management.
这些产品不仅提供了版本控制,而且提供了变更跟踪,支持变更管理的工作流以及全面的资产管理。
Solution partitioning, visibility, control and change management.
方案的配分、可见度、控制和变更管理。
Addressing the social side of software engineering, Scrum's proven process patterns can offer immediate benefit in requirements management, change control, and project management.
至于软件工程的社会效应方面,Scrum已被证实的过程模式可以即时地方便需求管理,变化控制以及项目管理提供。
While version control and change management are not customer activities in the SaaS model, they must be tested to ensure they can be verified adequately.
在SaaS模型中,版本控制和更改管理并非客户行为,但必须对其进行须测,以确保它们能被充分验证。
When the changes are committed in the version control system, they can later be extracted from the version control system and used to continue the change management process.
在版本控制系统中提交更改之后,可以稍后从版本控制系统中提取它们并继续变更管理流程。
This process results in a project management plan that is updated and revised through the Integrated Change Control process.
这一过程的结果使项目管理计划通过整体变更控制过程得以更新与修改。
Incident and change Management - Initial point-of-entry support for incidents and change control.
突发事件及变更管理——提供应对突发事件及变更控制的初级支持。
Since the control strategy is dynamic and may change this should be handled as a life cycle approach requiring the use of quality risk management and knowledge management.
由于控制策略是动态的,可能会发生变更,因此需要采用质量风险管理和知识管理工具,作为一个生命周期方法来管理。
Thee project management team uses stakeholders with expert judgment on the change control board to control and approve all requested changes to any aspect of the project.
项目管理团队利用在变更控制委员会具有专家判断的利害关系者,控制与批准项目各个方面的所有变更请求。 。
Configuration management life cycle for identified work products, i. e., the point at which products are placed under various levels of control, change control authority, etc.
为标识工作产品而进行配置管理的生命周期,也就是说,产品被放置在各种级别控制下的要点、变更控制权等。
Be familiar with plant, divisional and worldwide goals related to quality, validation, risk management and change control.
熟悉工厂、区域和全球的涉及到质量、验证、风险管理和变更控制的目标。
Project Procurement Management includes the contract management and change control processes required to administer contracts or purchase orders issued by authorized project team members.
项目采购管理包括合同管理和变更控制过程,它们是管理由授权的项目团队成员签发的合同或采购订单所必需的。
All changes to the project management plan flow through the change management process and integrated change control.
所有关于项目管理计划的变更遵守变更管理流程并置于变更控制之下。
Administer, control and realize changes to the nominated business case baseline definitionon basis of the specific global Change Management processes within the BusinessUnit.
基于全球变更管理流程,管理,控制和执行相关产品的变更需求。
In most application areas, the configuration management system includes the change control system.
在大多数应用领域,配置管理系统包含变更控制系统。
The rules of land utilization control and change are important measures for strengthening land management.
土地用途管制与转用许可制度是加强土地管理的重大举措。
Since has strided in the new century, economic environment's change proposed to the Global business financial control the new request, particularly speaking of Our country business finance management.
跨入新世纪以来,经济环境的变化对全球企业财务管理都提出了新的要求,尤其是对我国企业财务管理而言。
Following the change of banking environment, the capital adequacy management becomes the important means of banking supervision and important contents of banking internal control.
随着银行业经营环境的变化,资本充足性管理已成为当今银行业监管的重要手段和银行内部控制的重要内容。
Change control is necessary because projects seldom run exactly according to the project management plan.
由于项目很少会准确地按照项目管理计划进行,因而变更控制必不可少。
In most application areas the change control system is a subset of the configuration management system.
在大多数应用领域,变更控制制度是配置管理制度的一个组成部分。
Feasible irradiate justification function is by sequencing management control stand by consumer's change different requirements.
切实可行的照射调节功能是通过程序化管理控制支持客户日益变化的不同需求。
And then strengthening the management of road construction projects engineering change control strategy is proposed.
继而提出加强公路建设项目工程变更管理的控制策略。