Moving up a layer has a cost in terms of adopting certain practices in development, build, and operations, but also has benefits.
就开发、构建和运营时所采用的具体实践来说,升级到上一层会有成本,但也会有好处。
That saves time per build if your system is set up correctly, but it can cost you a lot of time if it isn't.
如果您的系统已经正确设置,那么每次构建时就可以节省大量时间,不过如果环境未设置好,就会浪费许多时间。
This tree implementation (package com.icl.saxon.tinytree) takes up far less memory and is quicker to build, at the cost of slightly slower tree navigation.
该树实现(包com . icl . saxon . tinytree)占用极少的内存,并且构建过程更迅速,但其代价是浏览树的速度会稍微慢一点。
The 20-acre Harry Potter park reportedly cost $250 million to build and recreates the Hogwarts School of Witchcraft and Wizardry and other places dreamed up by author J. K.
据报道,占地20英亩的哈利波特公园建造耗资达2.5亿美元,园内再现了霍格沃茨魔法学校和作者J?
Through analysis on the study of drilling cost both at home and abroad, the main factors influencing the drilling cost have been found to guide to build up the forecast model on the drilling cost.
通过对国内外钻井成本研究的分析,寻找影响钻井作业成本的主要因素,可指导钻井作业成本预测模型的建立。
How to achieve high port handling capacity, meet the requirement of client and build up competing ability in market with lower cost, which is all along the high light in port plan and design.
如何以尽可能低的造价,实现高效的装卸能力,满足客户的要求,增强港口的市场竞争能力一直是港口规划设计研究的重点。
Because the competitor wants to build up a database for is similar to with a nice bit of cost.
因为竞争者要用相当多的成本建立一个类似的数据库。
Through these model, enterprises can build up competitive advantage on exploring new market, cutting cost of supplying, higher the barrel of entering and improving quality of product and service.
通过这样的模式企业可以在打开新市场、降低供货源头成本、提高进入壁垒并且提高产品与服务质量等方面树立自身竞争优势。
Because the competitor wants to build up a database for is similar to with a nice bit of cost, and is almost impossible.
因为竞争者要用相当多的成本建立一个类似的数据库,而且几乎是不可能的。
The practical operation indicates that the system has the merits of simple to build up, low running cost, always on line, easy to extend and maintain.
实际运行情况表明,系统具有组网简单、运行成本低、永远在线、易于扩展和便于维护等优点。
This paper is based on UTAUT model combined with the "consumer experience", "path dependence", "Environmental Trust", "perceived cost" to build up the "location based services."
本论文就是基于UTAUT模型,结合“消费体验”、“路径依赖”、“信任环境”、“感知成本”等因素共同构建了“移动位置服务接受模型”。
The skyscraper will cost an estimated $700m to build and should be up and running in Dubai in 2010.
此楼造价估计为为7亿美元,预计在2010年杜拜建成运行。
The skyscraper will cost an estimated $700m to build and should be up and running in Dubai in 2010.
此楼造价估计为为7亿美元,预计在2010年杜拜建成运行。
应用推荐